Shandong FBQ1000 water sealed explosion-proof device technical indicators coal mine water sealed explosion-proof device specifications are complete
Shandong FBQ1000 water sealed explosion-proof device technical indicators coal mine water sealed explosion-proof device specifications are complete

Shandong FBQ1000 water sealed explosion-proof device technical indicators coal mine water sealed explosion-proof device specifications are complete

Category:

Security/Explosion proof equipment/Explosion proof equipment

Model:

FBQ1000

Brand:

Hongyi

Retail Price

4,300.00USD


重量

kg

  • Product Description
  • Description :

      FBQ1000Water sealed explosion-proof device, coal mine water sealed explosion-proof device, FBQ water sealed explosion-proof device

      We strive to focus on our positions and seize opportunitiesFBQ1000 water sealed explosion-proof deviceQuality, meticulous productionFBQ1000 water sealed explosion-proof device, EnhanceCoal mine water sealed explosion-proof deviceService skills, creating a service scope.

      FBQ1000Water sealed explosion-proof deviceReference technical parameters

      The water sealed explosion-proof device is divided into 13 specifications, including fbq-0 to 12 types, corresponding to gas drainage pipeline inlet and outlet diameters ranging from dn150 to dn1000. The main technical specifications are as follows

      Model fbq

      Specification 150~1000

      Height 1150-2000mm

      Explosion proof cylinder diameter 800-1850

      Import and export pipe diameter 150-1000

      Main technical specifications: Applicable drainage system pipe diameters: 150, 200, 250, 300, 350, 400, 450, 500, 600, 700, 800, 1000mm (other drainage system pipe diameters can be designed and manufactured according to user requirements)

      Work pressure (gauge pressure): ≤ 0.04mpa

      Weight 320-1800kg

      

      FBQ1000Water sealed explosion-proof deviceworking principle:

      When gas is pumped out, the gas enters the water through the inlet bend, then precipitates from the water and is discharged through the outlet bend. The water sealed explosion-proof device and water sealed explosion prevention device isolate the inlet and outlet pipelines through water seals; When an explosion occurs at one end, a continuous explosion cannot be formed under the isolation of the water seal. At this time, the rubber plate of the pressure relief device is flushed open to release pressure, protecting the safety of the well, pumping station equipment, and users.

      FBQ1000Water sealed explosion-proof deviceProduct instructions: Install the water sealed explosion-proof device on the suction and exhaust pipelines of the gas pump at the inlet and outlet ends. After the connection is completed, inject water from the inlet valve at the upper end of the device. The water level can be observed through the gauge plate and should not exceed the support baffle. It should be kept at the middle position of the warning line above and below the liquid level gauge. During use, close the inlet valve. The water sealed explosion prevention device should be used within the calibrated pressure range on the nameplate. During use, the water level should be regularly observed and inspected. If gas leakage occurs, it should be stopped immediately.

      FBQ1000Water sealed explosion-proof devicePrecautions

      1. Regularly remove sediment from the explosion-proof cylinder to maintain clean water quality inside the cylinder.

      2. Regularly inspect the round iron cylinder and internal intake pipe for any cracking, corrosion, or perforation to prevent water seal failure;

      3. Connect the water pipe to the inlet pipe, ensuring that the water level inside the explosion-proof cylinder exceeds the size set at the bottom of the inlet pipe. Regularly observe the water level inside the explosion-proof cylinder to check if the water level control device is functioning properly.

      4. Regularly check whether the explosion-proof device is effective and whether the reset spring is working properly.

      5. Anti freezing and insulation facilities should be installed in winter, usually in the drainage pipeline corridor or dedicated room separated from the pump room.

      

    AfterSalesService :

    Key words:
    • FBQ1000 water sealed explosion-proof device