NLQ-45 Internal Combustion Sleeper Bolt Drilling Machine, Bolt Replacement, Concrete Sleeper Anchor Pulling Machine, Anchor Changing Machine
Category:
Transportation/Rail transit equipment machinery/Rail transit equipment
Model:
NLQ-45
Brand:
Hongyi
Retail Price
2,500.00USD
重量
kg
- Product Description
-
Description :
NLQ-45Internal combustion rail sleeper bolt drilling machine, bolt replacement, concrete sleeper anchor pulling machine, anchor changing machine
Sleeper bolt drilling machine, concrete sleeper bolt drilling machine, internal combustion sleeper bolt drilling machine, cement sleeper bolt drilling machine, railway sleeper bolt drilling machine, concrete sleeper anchor pulling machine, concrete sleeper anchor changing machine, internal combustion bolt drilling machine
Commend someone for using official documents well, and criticize someone for using the phone as much as possible.
1、 NLQ-45 internal combustion rail sleeper bolt drilling machine, concrete sleeper anchor pulling machine, anchor changing machineTechnical Specifications:
1. Gasoline engine power: 1.42kW.
2. Drilling diameter range: φ 38mm - φ 45mm.
3 NLQ-45 internal combustion rail sleeper bolt drilling machine, concrete sleeper anchor pulling machine, anchor changing machineTotal weight of the machine: 43kg.
4. Spindle speed: 2000 rpm.
5. Expansion slope: 3:20.



IIIntroduction to NLQ-45 Internal Combustion Sleeper Bolt Drilling Machine, Concrete Sleeper Anchor Pulling Machine, and Anchor Changing Machine:
The NLQ-45 internal combustion rail sleeper bolt drilling machine is mainly used for anchor pulling operations during the replacement process of railway concrete rail sleeper bolts. It is mainly used for anchor pulling operations during the replacement process of railway concrete rail sleeper bolts.
IIINLQ-45 internal combustion rail sleeper bolt drilling machine, concrete sleeper anchor pulling machine, anchor changing machineOperation:
1. Open the oil valve. During cold start, turn the air door to the "closed" position, and during hot start, turn the air door to the "open" position.
2. Confirm that the drilling machine has been clamped onto the steel rail, pull the start handle, control the length of the rope when pulling, slowly retract it back to the machine cover, and ensure that the start rope is rewound tightly.
3. After starting, rotate the choke valve away from the "closed" position, turn down the throttle, and let the machine idle. The drill rod will not rotate. If the drill rod rotates, it indicates that the idle speed is too high and should be adjusted accordingly.
Our factory specializes in producing and selling various specifications of turnouts and railway industrial and mining accessoriesNLQ-45 internal combustion rail sleeper bolt drilling machine, concrete sleeper anchor pulling machine, anchor changing machineWaiting for railway industrial and mining machinery and equipment. Hongye Yuantu, Xingbang Lishi, survive with quality, develop with reputation, Hongyi Mining is dedicated to serving you!

AfterSalesService :
Key words:- Internal combustion rail sleeper bolt drilling machine
More Products