Ankerui Substation Operation and Maintenance Cloud Platform, 24-hour uninterrupted protection
Ankerui Substation Operation and Maintenance Cloud Platform, 24-hour uninterrupted protection

Ankerui Substation Operation and Maintenance Cloud Platform, 24-hour uninterrupted protection

Category:

Electrical Engineering/Complete electrical and electrical equipment/Other electrical and electrical equipment

Model:

Acrelcloud-1000

Brand:

Acrel

model:

Acrelcloud-1000

type:

manufacturer

Processing & Customization:

No

purpose:

Safe Electricity Use

weight:

one

Place of Origin:

Jiangyin, Jiangsu

manufacturer:

Acrel

Retail Price

5,000,000.00USD


重量

kg

  • Product Description
  • model

    Acrelcloud-1000

    type

    manufacturer

    Processing & Customization

    No

    purpose

    Safe Electricity Use

    weight

    one

    Place of Origin

    Jiangyin, Jiangsu

    manufacturer

    Acrel

    Description :

      Electricity purchase and sales strategies of power sales companies in the market environment

      Develop a scientific pricing strategy

      When building a market price related decision-making system, it is necessary to calculate the modules of the upper and lower limits of prices under different conditions, in order to determine the pricing curve of electricity sales under different situations and time conditions, and to form timely response capabilities when quoting. When formulating pricing strategies, the following points should be considered: (1) it is necessary to study the linkage scheme between electricity prices and user product prices, so that they can form long-term cooperation with each other; (2) According to relevant competitive demands, different pricing strategies need to be developed for both long-term and short-term personnel; (3) It is not only necessary to study the power industry, but also its products, and based on this, differential pricing should be carried out according to the different electricity products used; (4) Need to track the actual supply and demand of the electricity market, and based on this, quote according to the cycle; (5) We need to develop a comprehensive pricing plan based on the combination of peak valley and time-sharing related products.

      Construction of Ankerui Substation Operation and Maintenance Cloud Platform

      1、 Introduction to Substation Operation and Maintenance Cloud Platform

      Function:

      With the gradual promotion and implementation of the national grid reform policy, the ordinary offline operation and maintenance mode has been unable to meet the market demand, and it is urgent to support the intelligent online operation and maintenance management and service platform. The operation and maintenance cloud platform of Ankeri substation (AcrelCloud-1000) provides supporting online operation and maintenance services for power operation and maintenance companies based on market demand feedback, using the Internet and big data technology. This platform serves as a link between operation and maintenance units and power consumption enterprises, monitoring the operation status and power data of user distribution systems, providing customers with better operation and maintenance services. The platform provides system overview, power data monitoring, power quality analysis, power consumption statistical analysis, daily/monthly/annual power statistics reports, abnormal warning, accident alarm and event recording, operating environment monitoring, operation and maintenance inspection dispatch, and supports multi platform and multi terminal data access.

      Application location:

      2、 Structure of Substation Operation and Maintenance Cloud Platform

      3、 Main functions of the substation operation and maintenance cloud platform

      Comprehensive Dashboard

      Through the comprehensive dashboard, the overall operation of the platform can be understood, and multiple templates are pre-set for users to choose from. It is the window and centralized control center for the platform to display to the outside world

      Power monitoring

      Real time monitoring of substation electricity usage through vector distribution diagrams, with screen response to remote signal displacement and remote sensing limit alarm. Clicking on a distribution circuit allows for the query of various detailed electricity parameters, including real-time values, small values, values, and average values;

      environmental monitoring

      Real time monitoring of the operating environment of the substation, including environmental temperature and humidity, water immersion, door magnets, smoke detectors, cable temperature, etc., and can achieve video monitoring and video playback;

      Fault Alarm

      Configurable remote signal displacement alarm (water immersion, smoke, door magnetic, switch tripping, etc.), telemetry limit exceeding alarm (overvoltage, undervoltage, overcurrent, cable temperature too high, winding temperature too high, etc.), operation alarm (instrument offline, gateway offline, etc.), and the received alarm can be pushed through SMS and web pages. The upper and lower limits of the alarm can be flexibly configured according to the on-site situation;

      energy efficiency analysis

      Collect hourly, daily, monthly, and annual electricity consumption data based on distribution circuits, regions, departments, and sub items (lighting, air conditioning, power, etc.), and conduct month on month analysis; Calculate the electricity consumption and amount of each distribution circuit according to peak, off peak, flat, and valley; Monthly statistics on the demand and occurrence value of each circuit, providing a basis for demand declaration;

      Equipment File

      The system can configure equipment information such as transformers, incoming cabinets, outgoing cabinets, metering cabinets, high-voltage cables, etc. in each substation, record the manufacturer, model, commissioning date, etc. of the equipment, and can use reports to count the equipment that needs maintenance or replacement in the near future;

      Inspect and eliminate defects

      Develop an inspection plan through the system and distribute it to the inspectors' mobile phones. The inspectors will perform inspection tasks at the substation site according to the inspection requirements. If defects are found during the inspection process, they can record the defects and generate a defect elimination task in the system;

      User Report

      The system automatically summarizes the operational data of the substation for one month, conducts statistical analysis on transformer load, distribution circuit electricity consumption, power factor, alarm events, etc., and lists various defects and their handling situations discovered during the inspection period;

      4、 Substation operation and maintenance cloud platform configuration

      On site hardware configuration

      5、 Business model of substation operation and maintenance cloud platform

      1) Data hosting method

      Ankrui guides users to complete the installation and debugging of intelligent instruments, current transformers, residual current transformers, temperature sensors, door magnets, network cameras, wireless modules, etc. Users upload data to the Ankrui substation operation and maintenance cloud platform, entrust Ankrui to manage, and charge software basic fees and hosting fees according to regulations/agreements.

      2) User built platform

      Improve the operational quality of substation staff and whether they are proficient in it

      The management of substation operation and maintenance mainly revolves around various substation equipment, and this control work directly affects the work efficiency that power enterprises can ultimately obtain. In order to ensure the continuity and reliability of power supply work, the current level of substation operation and maintenance management needs to be further improved. Operation and maintenance personnel should not only carry out necessary regular inspections, but also control detailed technical issues during daily patrols, maintain power equipment, and reduce erroneous operations in the operation and maintenance control process. After starting the automatic operation and maintenance management system, there should be no arbitrary handling of operation and maintenance control work. When dealing with grounding faults, work records should be kept during shift handover.

      In the past two years, Ankerui Substation Operation and Maintenance Cloud Platform has been built. Ankerui has successively participated in the construction of user end energy management platforms for some county and city power companies in Jiangsu Province, Yunnan Province's comprehensive energy service platform, and 147 school power operation and maintenance platforms in Jiading District, Shanghai. It has provided products including cloud platforms, intelligent gateways, terminal devices, etc. More than 700 sets of user end cloud platforms have been operated nationwide, and product functions have been continuously improved according to user needs. These projects are part of the future ubiquitous power Internet of Things.

      "The spring of the energy Internet is coming, and because of its ability, it will become a dynamic new energy business." Although there are some different voices about the ubiquitous power Internet of Things, the ubiquitous power Internet of Things has been quietly spread and integrated into all aspects of the infrastructure of the energy Internet.

    AfterSalesService :

    Key words:
    • Ankerui Substation Operation and Maintenance Cloud Platform