400m obstacle equipment standard 400m manufacturer
Category:
Sports and leisure/Sports supporting products/Other sports supporting products
Model:
DC651
Brand:
none
Retail Price
2,800.00USD
重量
kg
- Product Description
-
Description :
(1) 400 meter obstacle equipment welding: China's advanced imported two protection welding machine is used for carbon dioxide protection welding, with higher welding strength than ordinary welding, ensuring the firmness and aesthetics of the welding part; The composition and passing order of the 400 meter obstacle equipment standard and the training equipment manufacturer for crossing the sea and landing on the island in Laiwu are as follows:
100 meter run → turn around the flag → cross the three-step pile → cross the trench → jump over the low wall → pass through the high board jumping platform → pass through the cloud ladder → pass through the single wooden bridge → climb over the high wall → drill and climb the low pile net → turn around the flag and return → cross the low pile net → climb over the high wall → bypass the standing column under the single wooden bridge → pass through the cloud ladder → pass through the high board jumping platform → drill through the hole → jump down and climb up the trench → cross the five step pile → turn around the flag → run 100 meters to the finish line. The "Physical Exercise Standard Assessment Regulations" stipulate that starting from a 400 meter obstacle can be done in a standing or squatting position, and starting blocks are not allowed. When conducting the 400 meter obstacle assessment for common subjects, the starting method must be a lying down position. 400 meter obstacle equipment standard, 400 meter sea crossing and island landing equipment
400 meter obstacle equipment training obstacle equipment 400 meter obstacle crossing the sea and landing on the island training equipment manufacturer's breathing method:
At the beginning of running on flat ground, naturally deepen your breathing, and the rhythm of your breathing should be coordinated with the running rhythm. At the end of the run, the frequency and depth of your breathing should increase, and when passing through obstacles, you can use "wide range" force. After passing through obstacles, one should adjust their breathing in a timely manner, focusing on exhaling air. Breathing is done using the nose and half open mouth, and the breathing method is basically the same as that of middle and long-distance running.
Notes for manufacturers of training equipment for crossing the sea and landing on the island in Laiwu:
1. Climbing over a high wall. The body passes through a high wall.
2. Walk around the bridge pillar. The body must go around every pillar.
3. By jumping on a high board. The body passes through two tabletops and a high board. 400m Obstacle 400m Obstacle Equipment Manufacturer
4. Drill through the hole. The body passes through the hole.
5. Jump down and climb up the trench. Jump off the trench and climb up again.
6. 5 steps to cross the pile. Step on the 5 pile surfaces one by one, and do not touch the ground between the front and rear marking lines with your body.
7. During the journey, one should pass through obstacles according to the prescribed methods for each obstacle. If an obstacle is not passed according to the prescribed action, the obstacle must be re passed, otherwise the score will not be counted.

(2) Shot blasting rust removal: Physical and mechanical rust removal is used on the surface, which not only removes rust but also increases the surface area of the equipment, laying the foundation for strengthening the plastic powder adsorption ability in subsequent processes. This is an unparalleled advantage of acid pickling rust removal;
(3) Electrostatic spraying: Advanced electrostatic spraying equipment and advanced environmentally friendly electrostatic powder spraying technology are used to spray the surface of the equipment, greatly improving its weather resistance and impact resistance. The color remains unchanged for eight years, and surface shot blasting hardening and purification green environmental protection technology are adopted in the front sequence, making the surface quality of the product reach the international advanced level and more environmentally friendly than traditional phosphating treatment process.
(4) Connection parts of 400 meter obstacle equipment: All connection parts are fastened with specially designed anti loosening and anti-theft screws, ensuring that the equipment is protected from human damage and normal use, and also preventing scratches from water chestnuts during use. The surface meets the requirements of commonality, safety, and image. 400m obstacle equipment standard 400m manufacturer

(5) Our products are designed and produced strictly in accordance with the national standard - "General Requirements for Fitness Equipment Safety". During the production process, we strictly control the quality to ensure that each product leaves the factory with a qualified rate, pursue zero defects in products, and achieve industry standards. Main business: Training for 400m obstacle equipment manufacturers, 400m obstacle equipment manufacturers, Texas obstacle equipment manufacturers, fire training for single plank bridge manufacturers, 400m obstacle equipment manufacturers, single plank bridges, high walls and low platforms, fire obstacle equipment manufacturers. The necessary auxiliary tool for military academy training is the 400 meter obstacle equipment, which is indispensable for every military academy. The price for a complete set of 400 meter obstacle equipment is directly sold by the factory.
Main business: 400 meter obstacle equipment quotation, 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment
Training high and low wall prices, where can I buy equipment for the military 300 meter obstacle race, and supply of fire training single plank bridges. And our team's training equipment is supplied to the country. Please contact us if you need it. We carry out customized processing within the country. Our cooperative teams include: Fujian Ningde 400m, Gansu Lanzhou 68029 team, Beijing 66429 high wall obstacle board, Ningxia Wuzhong 68242, Henan Jiaxian 54647 team, Shaanxi Xi'an Military Region, Shaanxi Baoji Military Region, Hebei Baoding 66105400m, Hubei Wuhan Military Region 400m, Shijiazhuang 400m, Shanxi Xinzhou 66014 team pile net, high and low jumping platform, collapsed pile, wave wood, high and low jumping platform, horizontal ladder, tire wall, soft rope inclined ladder, fixed wheel, three person cooperation frame, turning flag and other obstacle equipment suitable for military, navy, school training, etc. We sincerely welcome customers in need to consult and negotiate business! The standard 400 meter obstacle equipment manufacturer's phone number is Yingde, and the production rate of fixed length pipes has decreased significantly compared to regular length pipes. It is reasonable for the production enterprise to request a price increase. The increase in price varies among companies, generally around 10% above the base price. C、 Multiple length: The multiple length should be within the usual length range, and the contract should specify the single length and the multiples that make up the total length (such as 3000mm × 3, which is a multiple of 3000mm and a total length of 9000mm). In practical operation, an allowable positive deviation of 20mm should be added to the total length, and each single foot length should have a margin for cutting. Taking structural pipes as an example, it is stipulated to leave a cutting allowance of 5-10mm for outer diameters ≤ 159mm and 10-15mm for outer diameters>159mm. If there is no length deviation or cutting allowance specified in the standard, the supply and demand parties should negotiate and indicate it in the contract. The double length is the same as the fixed length, which will significantly reduce the yield rate of production enterprises. Standard 400m obstacle equipment manufacturer phone number Yingde enrollment target: Undergraduate graduates who have received training from command colleges and have worked continuously for more than 2 years, with a duration of 2 and a half to 3 years. Graduates are suitable for command work, military or higher level government work, theoretical research and teaching work. 400m Obstacle Equipment Standard 400m Obstacle Hundred meter Obstacle Equipment China University of Civil Defense Science and Technology, formerly known as * * * Harbin Engineering College, is the cradle of future scientists, technical experts, and new commanding officers. National University of Defense Technology is a national key comprehensive university under the dual leadership of the Ministry of National Defense and is included in the key construction of the national "985 Project" and "211 Project". The predecessor of the school was the Engineering College founded in Harbin, Heilongjiang Province in 1953, abbreviated as "Ha * * *". In 1970, the main body of the school was relocated to Changsha and renamed Changsha Institute of Technology. In 1978, it was rebuilt as National University of Defense Technology. The school is located in Shashi, Hunan, China, covering a total area of 373 hectares. After more than 50 years of construction and development, the school has become a comprehensive university covering 10 disciplines including science, engineering, management, economics, philosophy, literature, education, law, and history. The swinging platform comprises a platform surface and an obstacle column irregularly fixed on the platform surface. The bottom of the platform surface is equipped with a swinging device composed of rollers and arc-shaped supports. Obstacles also include soft bridges, swinging ladders, and cross nets, and the arrangement order of obstacles is soft bridges, spiral ladders, rope nets, tire climbing platforms, swinging platforms, swinging ladders, and cross nets. Obstacles also include high and low horizontal beams, blocking walls, and simulated beaches. The order of obstacle arrangement is soft bridge, spiral ladder, high and low horizontal beams, rope net, tire climbing platform, swinging platform, swinging horizontal ladder, cross net, blocking wall, and simulated beach. The length of the obstacle course is 100-120 meters, the width is 20-25 meters, and the runway is 300-500 meters long. It is divided into four sections with three turning points arranged in the training field, namely the starting point, soft bridge, spiral ladder, and high and low crossbars; ***Folding point, rope net, tire climbing platform, swinging platform; Second turning point, shaking horizontal ladder, crossing net, blocking wall; Third turning point, simulated beach, endpoint. 400m obstacle equipment standard 400m armed 400m obstacle
Detailed specifications of 400 meter obstacle equipment; 400m obstacle equipment standard 400m manufacturer
Plum Blossom Pile; Composed of 5 cross piles with a diameter of 0.3 meters and a height of 0.1 meters above the ground. The midpoints of the three cross piles on the right are 2.3 meters apart, 0.3 meters away from the centerline of the runway, and 5 meters away from the end line. The midpoints of the two cross piles on the left are 2.3 meters apart, 0.6 meters away from the centerline of the runway, and 6.15 meters away from the end line. 400m obstacle equipment standard 400m manufacturer
A low wall; Width of 2 meters, height of 1.1 meters, and thickness of 0.2 meters. The hole is 0.5 meters wide, 0.4 meters high, and its lower edge is 0.6 meters above the ground. It is located on the left side of the low wall.
High board; 1.8 meters high, 2 meters long, 0.5 meters wide, and 0.05-0.08 meters thick. 400m Obstacle Equipment Standard 400m Manufacturer 400m Obstacle refers to a runway composed of eight sets of obstacles including cross piles, trenches, low walls, high board jumping platforms, cloud ladders, single wooden bridges, high walls, and low pile nets. Because we have to pass through obstacles once in both directions, it should be said that Cheng has to pass through obstacles 16 times. The sequence of passing is: 100 meters run → turn around the flag → cross the three-step pile → cross the trench → jump over the low wall → pass through the high board jumping platform → pass through the cloud ladder → pass through the single wooden bridge → climb over the high wall → drill and climb the low pile net → turn around the flag and return → cross the low pile net → climb over the high wall → turn around the column under the single wooden bridge → pass through the cloud ladder → pass through the high board jumping platform → drill through the hole → jump down and climb up the trench → cross the five step pile → turn around the flag → run 100 meters to the finish line. There are a total of 14 obstacles, mainly including training facilities such as cross piles, trenches, low walls, high board jumping platforms, single plank bridges, and high walls The flagpole is 1.5 meters high and has a diameter of about 5 centimeters. It consists of 5 cross stakes with a diameter of 0.3 meters and a height of 0.1 meters above the ground. The midpoints of the three cross piles on the right are 2.3 meters apart, 0.3 meters away from the centerline of the runway, and 5 meters away from the end line. The midpoints of the two span piles on the left are 2.3 meters apart and 0.6 meters away from the centerline of the runway. The midpoint of the first span pile is 6.15 meters away from the end line. Specifications for a single wooden bridge, dimensions of 5 * 0.25 * 0.23 meters, parameters for a single wooden bridge, price for a single wooden bridge, manufacturer of a single wooden bridge, length of 5 meters, height of 1.3 meters, diameter of 20-25 centimeters, width of the bridge plane of 10 centimeters, length of the inclined plate of 2 meters, and width of 20 centimeters. The columns under the bridge are spaced 1-1.30 meters apart and should be painted with red and white colors, mainly composed of steel pipes. A set of 400 meter obstacle training equipment, including high walls, low walls, high board jumping platforms, single plank bridges, and ground pile nets
High platform; Height of 1.5 meters, length and width of 1 meter each. 400m obstacle equipment standard 400m manufacturer
Low platform; Height, length, and width are each 1 meter. High board, high platform, and low platform are spaced 1 meter apart.
Horizontal ladder; Length of 5 meters, width of 0.6 meters, height of 2.4 meters, horizontal bars of 0.03-0.04 meters, with a span of 0.5 meters between horizontal bars, and a distance of 0.3 meters from the high board jumping platform.
single-plank bridge; Length of 5 meters, bridge deck width of 20 centimeters, thickness of 13 centimeters, height of 1.3 meters, inclined plate length of 2 meters and width of 0.2 meters
The columns under the bridge should be spaced 1-1.3 meters apart and painted with alternating red and white colors.
High walls; Width and height are 2 meters each, and thickness is 20 centimeters.
Low pile net; Twelve vertical stakes are arranged in two rows, with a spacing of 2 meters and a spacing of 1 meter. The stakes are raised 0.5 meters above the ground, and elastic materials are used to straighten the horizontal lines between each pair of stakes to form a pile network. The ground below the network should be covered with a soft sand layer. 400m obstacle equipment standard 400m manufacturer
400m obstacle equipment manufacturer tells you: the process of making 400m obstacle equipment 400m obstacle equipment standard 400m manufacturer
1. The main frame is welded with 12 # channel steel to form an I-shaped base, which is firmly welded and has a standard right angle. On the basis of the I-shaped base, weld channel steel and square tube as columns, and weld four triangular brackets near the column feet as supports to ensure stability and firmness. The middle is made of cedar wood, which has good thickness stability and can prevent a normal adult from tipping over. 400m obstacle equipment standard 400m manufacturer
2. Paint (spray coating), process: There are two colors: camouflage and military green. The wooden board and main frame are polished to ensure that there are no burrs on the main frame and wooden board, which is not easy to hurt hands. Surface spraying and spraying are carried out.
The surfaces of all steel parts of 400m barrier equipment are subject to primary treatment such as pickling, phosphating and sanding, and then the imported electrostatic epoxy based powder is applied for surface treatment. The product has the advantages of acid and alkali resistance, damp heat resistance, aging resistance, and beautiful appearance. It is suitable for wet and acid rain environments, and can be used indoors and outdoors. The product coating formula does not contain toxic elements, so as to avoid damaging the health of users. 400m obstacle equipment standard 400m manufacturer
Anqing Practice Competition Training Equipment Mobile 400m Obstacle Equipment Expansion Psychological Behavior Cloud Ladder Price
AfterSalesService :
Key words:- 400 meter obstacle equipment
More Products