400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment
400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

Category:

Sports and leisure/Sports supporting products/Other sports supporting products

Model:

DC651

Brand:

none

Retail Price

2,800.00USD


重量

kg

  • Product Description
  • Description :

      (1) 400 meter obstacle equipment welding: China's advanced imported two protection welding machine is used for carbon dioxide protection welding, with higher welding strength than ordinary welding, ensuring the firmness and aesthetics of the welding part; 400 meter obstacle equipment, 300 meter obstacle, and 100 meter obstacle equipment. The main frame of the 400 meter obstacle equipment is welded with 12 gauge channel steel to form an I-shaped base, which is firmly welded and has a standard right angle. On the basis of the I-shaped base, weld channel steel and square tube as columns, and weld four triangular brackets near the column feet as supports to ensure stability and firmness. The middle is made of cedar wood, which has good thickness stability and can prevent a normal adult from tipping over.

      Surface treatment of 400m barrier equipment: all steel parts are subject to surface treatment after primary treatment such as pickling, phosphating, sanding, etc. The imported electrostatic epoxy based powder coating is used for surface treatment. The coating thickness is 70-80um, pencil hardness is up to 3H+, and the test object has passed the GB1771-91 36 hour salt spray test. The coating film has no change, and the single-sided corrosion at the grid is< 2mm. The product has the advantages of acid and alkali resistance, moisture and heat resistance, anti-aging, and beautiful appearance. It can be used indoors and outdoors in humid and acid rain environments, and the product coating formula does not contain toxic elements, so as to avoid damaging the health of users.

      Structure of 400 meter obstacle equipment: Two supporting columns horizontally support a circular bar (with a constant diameter) to form a horizontal bar. Manufacturer of 400 meter obstacle equipment and 400 meter obstacle training equipment

      The supporting column stands upright on the ground There is a chassis below

      The 400 meter obstacle equipment uses four ropes (with a diameter of up to 1 centimeter) to pull the horizontal bar upright Four ropes are connected to four ground hooks on the ground

      400 meter obstacle equipment size: The diameter of the horizontal bar is 2.8 centimeters with an allowable error of+-0.01 centimeters, the distance between two connection points is 240 centimeters with an allowable error of+-1 centimeter, the distance between the joints is at least 200 centimeters with an allowable error of+-1 centimeter, and the distance from the ground to the high-level of the horizontal bar is 275 centimeters with an allowable error of+-1 centimeter

      Distance between ground hooks: allowable error+-5 centimeters for horizontal direction of 550 centimeters, allowable error+-5 centimeters for vertical direction of 400 centimeters. Function feature: adjustable, must be able to increase the height by 5 centimeters through height adjustment

      The horizontal bar of 400 meter obstacle equipment must have elasticity Guaranteed not to break Elasticity does not only come from rods The equipment as a whole also has elasticity This is the floor hook Supporting pillars The installation and tension of steel ropes must strictly comply with the requirements The reason for ensuring uniform elasticity The pole and supporting column must be connected by a flexible joint To ensure effective elasticity The lever must allow for turning and sliding movements on it At the same time, it is not easy to slip The entire device must be stable When in use The supporting column cannot move or swing Supply of 400 meter obstacle mobility equipment and 400 meter obstacle devices

      (2) Shot blasting rust removal: Physical and mechanical rust removal is used on the surface, which not only removes rust but also increases the surface area of the equipment, laying the foundation for strengthening the plastic powder adsorption ability in subsequent processes. This is an unparalleled advantage of acid pickling rust removal;

      (3) Electrostatic spraying: Advanced electrostatic spraying equipment and advanced environmentally friendly electrostatic powder spraying technology are used to spray the surface of the equipment, greatly improving its weather resistance and impact resistance. The color remains unchanged for eight years, and surface shot blasting hardening and purification green environmental protection technology are adopted in the front sequence, making the surface quality of the product reach the international advanced level and more environmentally friendly than traditional phosphating treatment process.

      (4) Connection parts of 400 meter obstacle equipment: All connection parts are fastened with specially designed anti loosening and anti-theft screws, ensuring that the equipment is protected from human damage and normal use, and also preventing scratches from water chestnuts during use. The surface meets the requirements of commonality, safety, and image. 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

      (5) Our products are designed and produced strictly in accordance with the national standard - "General Requirements for Fitness Equipment Safety". During the production process, we strictly control the quality to ensure that each product leaves the factory with a qualified rate, pursue zero defects in products, and achieve industry standards. Anqing Practice Competition Training Equipment Mobile 400m Obstacle Equipment Expansion Psychological Behavior Cloud Ladder Price 400m Obstacle Standard 400m Quality

      The height of the low wall is low and the difficulty is small, but the injury rate is high. Due to the excessive pursuit of speed and the neglect of skills, the psychological importance of training equipment in competitions is not high, resulting in cross injuries and forearm fractures.

      Protection method: The protector stands in front of the low wall (running direction) to support one side of the hand. When the practitioner makes a mistake with the mobile 400 meter obstacle equipment, they should support their upper arm to prevent injury from falling.

      JUSHI training equipment provides a new educational model that does not involve high or low grades. During training, some soldiers may not perform well in a certain project, and training equipment manufacturers are always worried that their performance may not be as good as others. JUSHI training equipment breaks the traditional education model of "teaching first, then understanding" with its experiential approach of "learning first", allowing soldiers to learn knowledge, expand their psychological behavior, and comprehend the truth through happy and active participation. Through personal experience, they can tap into their potential, cultivate innovative spirit and practical ability, and promote the formation of excellent character traits such as decisiveness, tenacity, confidence, and unity.

      Single person spiral ladder: specifications spiral ladder: length 4 meters x width 0.5 meters, bracket: 2 meters x 2.5 meters; Material Description of Training Equipment for Practice Competitions: Steel Structure, Central Axis Bearings, Flanges, Foot Screws, etc.

      Double person spiral ladder: specifications: spiral ladder: length 4 meters x width 0.5 meters, training equipment manufacturer bracket: mobile 400 meter obstacle equipment 3.4 meters x 2.5 meters; Material Description: Steel structure, central axis bearings, flanges, foundation screws, etc. 400 meter obstacle, 400 meter obstacle equipment, 100 meter obstacle equipment

      Flight Wheel (Fixed Wheel): Specification: Wheel diameter of 2 meters, expanding psychological behavior cloud ladder price center axis distance from the ground of 1.5 meters; Movable; Material Description: Steel structure, other standard components.

      Langmu: Specifications: Length 6 meters, Width 1.2 meters, Height 2.4 meters; Material Description: Training equipment for practice competitions includes steel structures, hot-dip galvanized chains, shackles, patterned plates, flanges, foot screws, etc.

      Joint equipment: specification: length 12 meters, width 2 meters, height 5 meters; Material Description: Mobile 400 meter obstacle equipment with steel structure, flanges, foot screws, etc.

      Soft Bridge: Specifications: Length 26 meters, Width 2.8 meters, Height 2 meters; Material Description: Expanded Psychological Behavior Cloud Ladder Price Steel Structure, Chain, Flat Steel, Flanges, Foot Screws, etc.

      Spiral ladder: Specification: Spiral ladder diameter 4 meters x height 4.2 meters; Material Description: Practice competition training equipment, steel structure, etc. A set of 400 meter obstacle equipment and 300 meter obstacle manufacturer

      Detailed specifications of 400 meter obstacle equipment; 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

      Plum Blossom Pile; Composed of 5 cross piles with a diameter of 0.3 meters and a height of 0.1 meters above the ground. The midpoints of the three cross piles on the right are 2.3 meters apart, 0.3 meters away from the centerline of the runway, and 5 meters away from the end line. The midpoints of the two cross piles on the left are 2.3 meters apart, 0.6 meters away from the centerline of the runway, and 6.15 meters away from the end line. 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

      A low wall; Width of 2 meters, height of 1.1 meters, and thickness of 0.2 meters. The hole is 0.5 meters wide, 0.4 meters high, and its lower edge is 0.6 meters above the ground. It is located on the left side of the low wall.

      High board; 1.8 meters high, 2 meters long, 0.5 meters wide, and 0.05-0.08 meters thick. 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment - Dachuang is committed to customizing and processing training equipment for 400 meters, 300 meters, 500 meters, and five types. Dachuang Sports is honest, reliable, and reputable, providing you with comprehensive services. You are worth choosing!

      The passing criteria for the assessment items are divided by age, and there are seven groups of obstacles in the 400 meter obstacle course. Because we have to pass through obstacles once in both directions, it should be said that Cheng has to pass through 14 obstacles. Cheng is composed of the following seven obstacles: cross pile, trench, low wall, high board jumping platform, single plank bridge, high wall, and low pile net. 400 meter obstacle equipment training obstacle equipment source manufacturer

      The passing criteria are: 2 minutes and 30 seconds for those under 25 years old, 2 minutes and 40 seconds for those between 25 and 30 years old, 2 minutes and 50 seconds for those between 30-35 years old, and no assessment for those over 35 years old.

      The content of the 400 meter obstacle:

      100 meters: sprint 100 meters to the opposite side.

      Two hundred meters: through five step stakes, jumping deep pits, flying low boards, benches, climbing high and low platforms, climbing cloud ladders, climbing single wooden bridges, high board walls, and drilling wire mesh.

      Three hundred meters: jumping low pile net, high slab wall, drilling bridge pier, passing cloud ladder, high and low platform, drilling low slab wall, deep pit (2M), three-step pile.

      400 meters: sprint back 100 meters. Supply equipment for crossing the sea and landing on islands with 400 meter obstacles and 300 meter obstacles

      Price reference:

      1. 1.2 meters * 0.6 meters * 0.05 meters Available colors: blue, green

      Thickened Oxford cloth+pearl cotton

      1. Cross pile: composed of 5 cross piles with a diameter of 30 centimeters and a height of 10 centimeters above the ground The midpoints of the three cross stakes on the right are 2.30 meters apart, 30 centimeters away from the centerline of the runway, and 5 meters away from the end line The midpoints of the two spans on the left are 2.30 meters apart and 60 centimeters away from the centerline of the runway. The midpoint of the first span is 6.15 meters away from the end line The cross pile is composed of wooden piles or cement

      2. Trench: 2 meters in length, width, and depth each The ditch wall should be a vertical plane A set of 400 meter obstacle equipment and 400 meter obstacle training equipment from the original manufacturer

      3. Low wall: 2 meters wide, 1.1 meters high, and 20 centimeters thick The hole is 50 centimeters wide, 40 centimeters high, and its lower edge is 60 centimeters above the ground. It is located on the left side of the low wall The low wall is mainly composed of wooden boards

      400 meter obstacle equipment manufacturer 4. High board jumping platform: (High board height 1.80 meters, length 2 meters, width 50 centimeters, thickness 5-8 centimeters.) High platform height 1.5 meters, length and width 1 meter each Low platform height, length, and width each 1 meter High board, high platform, low platform spaced 1 meter apart, made of bricks and cement The horizontal ladder is made of wood and supported by angle iron. It is equipped with at least 15 horizontal bars with a diameter of 3-4 centimeters, four columns with a diameter of 5 centimeters or more, and a height of 2.5 meters

      High platform; Height of 1.5 meters, length and width of 1 meter each. 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

      Low platform; Height, length, and width are each 1 meter. High board, high platform, and low platform are spaced 1 meter apart.

      Horizontal ladder; Length of 5 meters, width of 0.6 meters, height of 2.4 meters, horizontal bars of 0.03-0.04 meters, with a span of 0.5 meters between horizontal bars, and a distance of 0.3 meters from the high board jumping platform.

      single-plank bridge; Length of 5 meters, bridge deck width of 20 centimeters, thickness of 13 centimeters, height of 1.3 meters, inclined plate length of 2 meters and width of 0.2 meters

      The columns under the bridge should be spaced 1-1.3 meters apart and painted with alternating red and white colors.

      High walls; Width and height are 2 meters each, and thickness is 20 centimeters.

      Low pile net; Twelve vertical stakes are arranged in two rows, with a spacing of 2 meters and a spacing of 1 meter. The stakes are raised 0.5 meters above the ground, and elastic materials are used to straighten the horizontal lines between each pair of stakes to form a pile network. The ground below the network should be covered with a soft sand layer. 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

      400 meter obstacle equipment manufacturer tells you: the process of making 400 meter obstacle equipment 400 meter obstacle equipment 300 meter obstacle 100 meter obstacle equipment

      1. The main frame is welded with 12 # channel steel to form an I-shaped base, which is firmly welded and has a standard right angle. On the basis of the I-shaped base, weld channel steel and square tube as columns, and weld four triangular brackets near the column feet as supports to ensure stability and firmness. The middle is made of cedar wood, which has good thickness stability and can prevent a normal adult from tipping over. 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

      2. Paint (spray coating), process: There are two colors: camouflage and military green. The wooden board and main frame are polished to ensure that there are no burrs on the main frame and wooden board, which is not easy to hurt hands. Surface spraying and spraying are carried out.

      The surfaces of all steel parts of 400m barrier equipment are subject to primary treatment such as pickling, phosphating and sanding, and then the imported electrostatic epoxy based powder is applied for surface treatment. The product has the advantages of acid and alkali resistance, damp heat resistance, aging resistance, and beautiful appearance. It is suitable for wet and acid rain environments, and can be used indoors and outdoors. The product coating formula does not contain toxic elements, so as to avoid damaging the health of users. 400 meter obstacle equipment, 300 meter obstacle equipment, and 100 meter obstacle equipment

      Anqing Practice Competition Training Equipment Mobile 400m Obstacle Equipment Expansion Psychological Behavior Cloud Ladder Price

    AfterSalesService :

    Key words:
    • 400 meter obstacle equipment