Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment
Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

Category:

Sports and leisure/Sports supporting products/Other sports supporting products

Model:

DC651

Brand:

none

Retail Price

2,800.00USD


重量

kg

  • Product Description
  • Description :

      (1) 400 meter obstacle equipment welding: China's advanced imported two protection welding machine is used for carbon dioxide protection welding, with higher welding strength than ordinary welding, ensuring the firmness and aesthetics of the welding part; The 400 meter obstacle equipment standard for Suqian and the 400 meter sea crossing and island landing equipment can accelerate the development pace of the sports economy market; Xinjiang Kashi 400m obstacle manufacturer Hubei outward bound training equipment, Hunan window target price Guangzhou bench press customized, Nanning training abdominal muscle plate Haikou single parallel bars where to sell Sichuan 400m obstacle equipment how much, Guizhou high board platform price Kunming Mobile low stake network customized Xizang Lhasa single parallel bars

      Manufacturer's process for 400 meter obstacle equipment:

      1. The main frame is welded with 12 # channel steel to form an I-shaped base, which is firmly welded and has a standard right angle. On the basis of the I-shaped base, weld channel steel and square tube as columns, and weld four triangular brackets near the column feet as supports to ensure stability and firmness.

      The middle is made of cedar wood with a thickness of

      Stability is good, and a normal adult will not flip over when turning over.

      2. Paint (spray coating), process: There are two colors: camouflage and military green

      Polish both the wooden board and the main frame to ensure that there are no burrs on the main frame and wooden board, and that they are not easy to hurt hands. Apply surface spraying and painting. 2. Light conditions: Podocarpus mongolicus can grow in strong light or in half shade. If the temperature is too high in summer, at this time, Podocarpus chinensis will take advantage of its body shape and will not have much impact on its growth. Therefore, a series of shading measures can be omitted, but the leaves need to be watered irregularly. The adjusting screw should not move accidentally after being fixed. The regulating device must be dual to ensure that it does not loosen during use.

      parallel bars

      Structure: This instrument consists of two rods of the same specifications. Two poles are parallel and at the same height.

      The positions of the two bars are parallel and can be pre stressed.

      Each pole is supported by two vertical columns, with a fixed base underneath the columns.

      The supporting vertical column includes a fixed part and a movable part, which can adjust the height and width of the parallel bars.

      The cross-section of the rod is in the shape of a water droplet, and the cross-section of the entire rod is identical.

      Size: Rod

      Length 350 centimeters

      Cross section vertical axis height 5 centimeters

      Cross section horizontal axis height 4 centimeters

      The distance from the top of the pole to the ground is 195 centimeters

      Three after-sales services

      The Outline of the People's Fitness Plan attaches great importance to the active development of community sports, making the development of community sports increasingly important. Mobilizing the people and the entire society to actively participate in and support mass sports activities, striving to improve the physical fitness and health level of the nation, has important and profound significance for the spiritual and material civilization construction of our country, the prosperity and development of the nation, and the health and happiness of future generations.

      The cost of a building is twice that of civil engineering, reaching 1000 yuan per square meter. In addition, building pig farming generally has a high density of pigs, and pig herds are too concentrated. If ventilation measures are not in place, it can cause a high concentration of harmful gases such as ammonia in the pigsty. If pigs continue to grow in this environment, it can easily cause respiratory diseases.

      Secondly, remove the constraints of the original competitive sports structure on students and add some interesting projects to stimulate their learning enthusiasm. 2.3 Strengthen the construction of sports infrastructure and create a good sports teaching environment: The shortage of sports venues and equipment in primary schools cannot be solved in a short period of time. Schools and teachers should start from their own reality, come up with methods and solve practical problems to ensure the smooth progress of sports teaching. Schools can set up special funds for sports teaching facilities and establish relevant systems for the maintenance and care of sports teaching equipment.

      Military training 400 meter obstacle board, obstacle board high wall height, installation spacing size of each 400 meter obstacle equipment item, distance from the turning flag to the cross pile of 5 meters, distance from the cross pile to the trench of 10 meters, distance from the trench to the low wall of 15 meters, distance from the low wall to the high board jumping platform and horizontal ladder of 15 meters, distance from the high board jumping platform and horizontal ladder to the single wooden bridge of 20 meters, distance from the single wooden bridge to the high wall of 18 meters, distance from the high wall to the low pile net of 10 meters, and distance from the low pile net to the turning flag of 7 meters.

      How much does a set of 400 meter obstacle equipment cost? It can be used for one handed and one foot support jumping, one handed support jumping, or pedal jumping One handed and one foot support jumping over: One leg kicks off the ground, causing the body to jump onto a low wall. The jumping leg quickly lifts up, supporting the wall behind, and running with the supporting leg swinging forward One handed support jumping over: one leg forcefully kicks the ground and jumps forward, crossing the low wall and landing on the ground Stepping and Jumping Over: One leg jumps off the ground, the body jumps up, the other leg steps on the upper edge of the low wall, retracts the ground leg, and crosses the low wall.

      Training Techniques for 400 meter Obstacle Run

      Physical allocation for 400 meter obstacle running. The 400 meter obstacle race requires running at a "uniform" speed to complete the distance. The 400 meter obstacle requires running 100 meters on flat ground before passing through the obstacle. It has to travel back and forth 200 meters, passing through 14 obstacles. Smoothly and quickly passing through obstacles is an important guarantee for completing the journey. Therefore, running on flat ground for the first 100 meters requires speed, ease, and effort. In the process of running between obstacles, there should be a step point adjustment stage, that is, after passing through obstacles, the step point should be adjusted well, and before passing through the next obstacle, the running speed should be slightly increased, with a clear rhythm, to achieve the goal of smoothly and quickly passing through obstacles. When all obstacles are passed, the race enters the finish line, demanding strength and carrying forward the spirit of tenacious struggle to reach the finish line.

      (2) Shot blasting rust removal: Physical and mechanical rust removal is used on the surface, which not only removes rust but also increases the surface area of the equipment, laying the foundation for strengthening the plastic powder adsorption ability in subsequent processes. This is an unparalleled advantage of acid pickling rust removal;

      (3) Electrostatic spraying: Advanced electrostatic spraying equipment and advanced environmentally friendly electrostatic powder spraying technology are used to spray the surface of the equipment, greatly improving its weather resistance and impact resistance. The color remains unchanged for eight years, and surface shot blasting hardening and purification green environmental protection technology are adopted in the front sequence, making the surface quality of the product reach the international advanced level and more environmentally friendly than traditional phosphating treatment process.

      (4) Connection parts of 400 meter obstacle equipment: All connection parts are fastened with specially designed anti loosening and anti-theft screws, ensuring that the equipment is protected from human damage and normal use, and also preventing scratches from water chestnuts during use. The surface meets the requirements of commonality, safety, and image. Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      (5) Our products are designed and produced strictly in accordance with the national standard - "General Requirements for Fitness Equipment Safety". During the production process, we strictly control the quality to ensure that each product leaves the factory with a qualified rate, pursue zero defects in products, and achieve industry standards. New 400 meter obstacle product description (also known as: five or eight items)

      New 400m Obstacle Product Description

      1. Low pile net:

      Main dimensions: width 2 meters, height 0.87 meters, length 4.88 meters; Chain net is 0.45 meters, 0.55 meters, and 0.65 meters above the ground, with adjustable third level;

      Main components: consisting of one soft chain mesh and four regulating tubes; Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      Main materials: The main column is made of ? 114mm steel pipe with a wall thickness greater than or equal to 3mm; The soft chain mesh is composed of welded steel pipes with a diameter of ? 6 steel chains and a diameter of ? 76X3 mm. The regulating pipe is made of ? 90 mm steel pipe, and the pipe wall thickness is greater than or equal to 3 mm. It is welded with hemispherical plugs;

      Features: It can be disassembled as a whole without the need for on-site welding; Can be moved multiple times without damaging the original equipment;

      Metal surface coating: using surface sandblasting treatment, primer: spraying epoxy rich powder coating, can ensure that it will not change color for five years.

      2. 2.4-meter high wall:

      ·Main dimensions: width of 2 meters, height of 2.4 meters, thickness of 0.2 meters; Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      ·Main components: Steel wood structure, consisting of a main frame and upper wooden boards;

      ·Main materials: The main frame is made of steel plates with a thickness greater than or equal to 4 millimeters, bent into 140mm channel steel and welded with 60X30X2.5mm rectangular pipes;

      ·The upper board is made of anti-corrosion wood with a thickness greater than or equal to 0.03 meters;

      Features: The equipment is detachable as a whole and does not require on-site welding; Can be moved multiple times without damaging the original equipment;

      Metal surface coating: using surface sandblasting treatment, primer: spraying epoxy rich powder coating, can ensure that it will not change color for five years.

      3

      Air soft network:

      Main dimensions: Soft mesh width of 5 meters, height of 3 meters, and length of 10 meters;

      Main components: divided into rib frame, tire, soft chain mesh, and column components;

      Main materials: The main column is made of ? 114mm steel pipe, with a wall thickness greater than or equal to 3.5mm; Is the ribbed wooden frame used? 60x3mm steel pipes with a spacing of 0.39m; The soft chain mesh is composed of 100mm channel steel welded with 6 steel chains, and the steel chain spacing is 0.25 meters; 10 tires with a diameter of 580x200mm;

      Features: The equipment is detachable as a whole and does not require on-site welding; Can be moved multiple times without damaging the original equipment; Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      Metal surface coating: using surface sandblasting treatment, primer: spraying epoxy rich powder coating, can ensure that it will not change color for five years.

      4

      Elevated speed descent:

      Main dimensions: width 4.83 meters, height 6 meters;

      Main components: composed of main frame, ladder, inclined sliding rod, and straight sliding rod;

      Main materials: The main column is made of ? 164mm steel pipe, with a wall thickness greater than or equal to 4.5mm; Sliding rod, inclined sliding rod

      Using a 90mm steel pipe with a wall thickness greater than or equal to 3mm; Are the columns on both sides of the ladder used? 60X2.5mm steel pipe,? 42X2.5mm steel pipe spacing 0.355m ladder support;

      Features: The equipment is detachable as a whole and does not require on-site welding; Can be moved multiple times without damaging the original equipment; Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      Metal surface coating: using surface sandblasting treatment, primer: spraying epoxy rich powder coating, can ensure that it will not change color for five years.

      5

      Diagonal swinging rope:

      Main dimensions: width 4 meters, height 7.5 meters, length 14 meters; The distance between the inner sides of the two platforms is 7 meters;

      Main components: consisting of a swinging rope main frame, platform, inclined plate, and protective sponge pad;

      Main materials: The main column is made of ? 164mm steel pipe, with a wall thickness greater than or equal to 4.5mm; The platform has a height of 1.7 meters, a width of 1 meter, and a length of 3.85 meters. The main materials used are 80 channel steel, ? 140 × 3mm steel pipe, and 2.5mm thick anti slip steel plate; The inclined plate is 3.2 meters long and 3.85 meters wide, mainly made of 80 channel steel and 2.5mm thick anti slip steel plate;; 40mm diameter nylon rope with a length of 7m; Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      Features: The equipment is detachable as a whole and does not require on-site welding; Can be moved multiple times without damaging the original equipment;

      6

      Gaolan:

      Main dimensions: length 4 meters, height 2 meters, width 0.3 meters;

      Main components: divided into three main frames with heights of 1.5 meters, 2 meters, and 0.8 meters, with a spacing of 0.6 meters between each group;

      Main materials: The main column is made of ? 76 steel pipe, with a wall thickness greater than or equal to 2.75 millimeters;

      Features: The equipment is detachable as a whole and does not require on-site welding; Can be moved multiple times without damaging the original equipment;

      Metal surface coating: using surface sandblasting treatment, primer: spraying epoxy rich powder coating, can ensure that it will not change color for five years.

      7

      Irish High Board:

      Main dimensions: length 5 meters, height 2-1.8 meters, width 0.4 meters; (3.257 meters long, 2 meters high; 1.743 meters long)

      Meter, height 1.8 meters)

      Main components: Steel wood structure, consisting of a main frame and upper wooden boards;

      Main materials: The main column is made of ? 140mm steel pipe with a wall thickness greater than or equal to 3.5mm; Wooden board material protection

      The rotten wood board is 0.4 meters wide and 40 millimeters thick;

      Features: The equipment is detachable as a whole and does not require on-site welding; Can be moved multiple times without damaging the original equipment;

      Metal surface coating: using surface sandblasting treatment, primer: spraying epoxy rich powder coating, can ensure that it will not change color for five years.

      8

      Curved rib:

      Main dimensions: width 0.5 meters, arc top height 3 meters, length 9.886 meters;

      Main materials: The main columns and horizontal pipes are made of ? 114mm steel pipes, with a wall thickness of 3mm; Ribs are made of ? 33

      Millimeter steel pipe, with a wall thickness of 3 millimeters and a spacing of 0.3 meters; Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      Features: The equipment is detachable as a whole and does not require on-site welding;

      Metal surface coating: using surface sandblasting treatment, primer: spraying epoxy rich powder coating, can ensure that it will not change color for five years.

      Detailed specifications of 400 meter obstacle equipment; Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      Plum Blossom Pile; Composed of 5 cross piles with a diameter of 0.3 meters and a height of 0.1 meters above the ground. The midpoints of the three cross piles on the right are 2.3 meters apart, 0.3 meters away from the centerline of the runway, and 5 meters away from the end line. The midpoints of the two cross piles on the left are 2.3 meters apart, 0.6 meters away from the centerline of the runway, and 6.15 meters away from the end line. Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      A low wall; Width of 2 meters, height of 1.1 meters, and thickness of 0.2 meters. The hole is 0.5 meters wide, 0.4 meters high, and its lower edge is 0.6 meters above the ground. It is located on the left side of the low wall.

      High board; 1.8 meters high, 2 meters long, 0.5 meters wide, and 0.05-0.08 meters thick. Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment innovation and transformation to promote development. Elastic steel double bar quotation supplier with excellent quality and price. Our Dachuang single bar manufacturer will supply every product with a serious and responsible attitude every day. Our Henan Dakang 400 meter obstacle equipment manufacturer seized the opportunity and launched a novel sales method to welcome new returning customers to purchase elastic steel double bars. In this way, the sales of the series of horizontal bars of the "Dachuang" fire training equipment management enterprise have greatly exceeded those of other domestic manufacturers of fire training equipment. The outstanding sales volume of the 400 meter obstacle equipment manufacturer in Henan Dakang has also enabled the "Dachuang" advanced parallel bar limited manufacturer to win the elastic steel parallel bars in the shopping mall through this promotion method.

      Jinnan Parallel Bar Operation Co., Ltd. is currently on the market with a special material for the bar surface, which is made of manganese steel. Henan Dakang 400m obstacle equipment manufacturer has seized the opportunity. Ordinary steel is only a combination of iron and carbon, while spring steel has a complex composition, is sturdy, durable, and wear-resistant elastic steel parallel bars. Manganese steel has the characteristics of being detachable and easy to maintain, with a long operating life, beautiful appearance, bright color, no fading, no need for paint, and good insulation function. Our fire exercise path, which provides a unique opportunity for Henan Dakang's 400 meter obstacle equipment manufacturer, has received praise from international users.

      We start by understanding our products and customers in order to have a flexible relationship with them. Our main products include basketball stands, basketball stand protective covers, table tennis tables, mobile leg press handles, badminton nets, children's music, Henan Dakang 400m obstacle equipment manufacturers, and we specialize in seizing opportunities in parks, children's playgrounds, outdoor fitness paths, track and field competition equipment, gymnastics mats, pole vaulting sponge mats, judo mats, martial arts training blankets, pole vaulting height mats, taekwondo mats, sponge mats, gymnastics supplies, sports facilities, dormitory beds, park chairs, artificial lawns, weightlifting, Henan Dakang 400m obstacle equipment manufacturers, and venue fences. We have a wide range of styles and applications, and our workmanship is certified by the country. We offer quotes. It is also unparalleled in the market, and we look forward to working with you! Henan Dakang 400 meter obstacle equipment manufacturer seizes the opportunity alone

      High platform; Height of 1.5 meters, length and width of 1 meter each. Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      Low platform; Height, length, and width are each 1 meter. High board, high platform, and low platform are spaced 1 meter apart.

      Horizontal ladder; Length of 5 meters, width of 0.6 meters, height of 2.4 meters, horizontal bars of 0.03-0.04 meters, with a span of 0.5 meters between horizontal bars, and a distance of 0.3 meters from the high board jumping platform.

      single-plank bridge; Length of 5 meters, bridge deck width of 20 centimeters, thickness of 13 centimeters, height of 1.3 meters, inclined plate length of 2 meters and width of 0.2 meters

      The columns under the bridge should be spaced 1-1.3 meters apart and painted with alternating red and white colors.

      High walls; Width and height are 2 meters each, and thickness is 20 centimeters.

      Low pile net; Twelve vertical stakes are arranged in two rows, with a spacing of 2 meters and a spacing of 1 meter. The stakes are raised 0.5 meters above the ground, and elastic materials are used to straighten the horizontal lines between each pair of stakes to form a pile network. The ground below the network should be covered with a soft sand layer. Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      400 meter obstacle equipment manufacturer tells you: the process of making 400 meter obstacle equipment

      1. The main frame is welded with 12 # channel steel to form an I-shaped base, which is firmly welded and has a standard right angle. On the basis of the I-shaped base, weld channel steel and square tube as columns, and weld four triangular brackets near the column feet as supports to ensure stability and firmness. The middle is made of cedar wood, which has good thickness stability and can prevent a normal adult from tipping over. Suqian 400m obstacle equipment standard 400m sea crossing and island landing equipment

      2. Paint (spray coating), process: There are two colors: camouflage and military green. The wooden board and main frame are polished to ensure that there are no burrs on the main frame and wooden board, which is not easy to hurt hands. Surface spraying and spraying are carried out.

      The surfaces of all steel parts of 400m barrier equipment are subject to primary treatment such as pickling, phosphating and sanding, and then the imported electrostatic epoxy based powder is applied for surface treatment. The product has the advantages of acid and alkali resistance, damp heat resistance, aging resistance, and beautiful appearance. It is suitable for wet and acid rain environments, and can be used indoors and outdoors. The product coating formula does not contain toxic elements, so as to avoid damaging the health of users.

      Anqing Practice Competition Training Equipment Mobile 400m Obstacle Equipment Expansion Psychological Behavior Cloud Ladder Price

    AfterSalesService :

    Key words:
    • 400 meter obstacle equipment