BAC Cooling Tower Water Collector BAC Evaporative Cooling Water Collector BAC Water Blocking Plate Production Plant
The 145mm collector plate of the BAC cooling tower is molded by machine pressing to ensure consistency in molding. The collector plates of the BAC cooling tower are connected by adhesive bonding, and the collector plates have good strength and overall rigidity, making installation and maintenance easy;