Changping District asphalt cold patching material/factory first-hand source order discount
Changping District asphalt cold patching material/factory first-hand source order discount

Changping District asphalt cold patching material/factory first-hand source order discount

Category:

fine chemicals /Fine Chemicals for Construction/Other building additives

Model:

MR-100

Brand:

Haiyan Xingye

model:

MR-100

Main ingredients:

asphalt

color:

black

odor:

none

density:

tall

water-soluble:

good

Minimum operating temperature:

-30

Maximum operating temperature:

forty

shelf life:

12 months

Packing Specification:

25kg

manufacturer:

Beijing Shunyi

Retail Price

1,300.00USD


重量

kg

  • Product Description
  • model

    MR-100

    Main ingredients

    asphalt

    color

    black

    odor

    none

    density

    tall

    water-soluble

    good

    Minimum operating temperature

    -30

    Maximum operating temperature

    forty

    shelf life

    12 months

    Packing Specification

    25kg

    manufacturer

    Beijing Shunyi

    Description :

      Changping District Asphalt Cold Patch Factory first-hand source order

      Fill the gaps around the manhole cover with cold replenishment material, wholesale from the factory

      Manhole cover gapFill in the cold repair materials and trust the manufacturer

      Asphalt pavement renovation and repair, cold asphalt/cold oil construction in the same city

      Beijing Haiyan Xingye produces, wholesales and retails, with sufficient supply and favorable prices. Welcome to order!

       Main business area:Beijing, Tianjin, Yanjiao, Langfang, Sanhe, Shunyi, Changping, Tongzhou, Chaoyang, Fangshan, Miyun, Pinggu, Mentougou, Shijingshan, Beijing urban area

      Cold asphalt aggregate1.0, Hot Asphalt Aggregate 1.3

      Purpose:

      Cold repair materials have good adhesion with different substrates such as asphalt concrete, cement concrete, and metal surfaces, and can be widely used for emergency repair and repair of various road surfaces such as highways, general roads, roads, bridges, etc.

      Usage method of cold asphalt

      Generally, the pit with repair and the surrounding gravel and waste residue should be cleaned up, and there should be no mud, ice or other debris in the pit. Repair of highways and road engineering. The repaired pits and trenches should have neat edges, and the removal of waste residue should be done until a solid and sturdy surface is visible. Add enough cold patching material into the pit until it is about 1.5cm above the ground. For highway and general road repairs, the amount of cold patching material can be increased by about 10%. After filling, the pit should be higher than the surrounding road surface and curved. When the depth of the road surface damage is more than 5cm, the filling work should be done in 4cm layers, filled layer by layer, compacted layer by layer, and laid evenly,

      For example, manual compaction, vibration plate compaction, roller compaction, and other methods. After compaction, a layer of stone powder or fine sand can be evenly sprinkled on the surface, and a cleaning tool can be used to sweep back and forth to fill the surface gaps with fine sand. The surface of the repaired groove should be smooth, flat, and free of wheel marks. The edges and corners of the groove must be compacted and free of looseness

    AfterSalesService :

    Key words:
    • Nankou Cold Asphalt