Shunyi Houshayu Asphalt Cold Patch Same City Ordering
Category:
building materials/Waterproof and fireproof functional materials/Cold base oil
Model:
MR-100
Brand:
Haiyan Xingye
model:
MR-100
impermeability:
tall
solid content:
twenty
bonding performance:
good
viscosity:
tall
shelf life:
three hundred and sixty
Applicable Temperature:
-20 to 40
purpose:
Road pothole repair
Packing Specification:
25kg
manufacturer:
Beijing Shunyi Haiyan Xingye
Retail Price
1,200.00USD
重量
kg
- Product Description
-
model MR-100
impermeability tall
solid content twenty
bonding performance good
viscosity tall
shelf life three hundred and sixty
Applicable Temperature -20 to 40
purpose Road pothole repair
Packing Specification 25kg
manufacturer Beijing Shunyi Haiyan Xingye
Description :
Cold fill material (cold asphalt) for backfilling around the manhole cover, same city delivery discount
Road repair (winter cold replenishment) Factory appointment for delivery
Shunyi District Thermal Pipeline Repair Asphalt Cold Oil (10 Aggregates) Factory Recommended Purchase
Haidian District Heating Pipeline Filling Cold Oil Asphalt Same City Quotation
Changping warehouse nearby delivery - Adequate supply - Price discounts - Free delivery for large quantities
Winter cold oil asphalt - hot oil asphalt - gray black concrete - emergency repair mortar - early strength concrete - steel fiber concrete - double ash reinforced pavement - base oil - asphalt oil
Road surface damage, subsidence, and cracking around road inspection wells are common situations. Once they occur, there are significant safety hazards that need to be repaired and dealt with in a timely manner. Repair concrete, early strength black gray concrete, asphalt cold patching material, hot oil asphalt, gray black concrete, repair mortar, reinforcement mortar, customers choose products according to their needs.
The construction process is as follows:
1. Slotting: chiseling and cleaning the edge of the manhole cover, asphalt and concrete
2. Cleaning: Clean the pits and grooves, ensure there are no debris or standing water, and compact the ground base layer
3. Filler: Remove the bag of asphalt cold patch and pour it in, spread it evenly, and the height of the filler should be slightly 1.2-1.5cm above the ground.
(Five centimeters thick, compacted once, ten centimeters thick, compacted twice)
4. Compaction: Use flat vibrating compaction tools or small rollers for thorough compaction.
5. Clean up the site and open up traffic.




AfterSalesService :
Key words:- Tianzhu Cold Supplement
More Products