Daxing asphalt cold patching material/asphalt cold oil/electric power water conservancy pit repair construction
Category:
fine chemicals /Fine Chemicals for Construction/Other building additives
Model:
MR-100
Brand:
Haiyan Xingye
model:
MR-100
Main ingredients:
asphalt
color:
black
odor:
none
density:
tall
water-soluble:
good
Minimum operating temperature:
-30
Maximum operating temperature:
forty
shelf life:
12 months
Packing Specification:
25kg
manufacturer:
Beijing Shunyi
Retail Price
1,300.00USD
重量
kg
- Product Description
-
model MR-100
Main ingredients asphalt
color black
odor none
density tall
water-soluble good
Minimum operating temperature -30
Maximum operating temperature forty
shelf life 12 months
Packing Specification 25kg
manufacturer Beijing Shunyi
Description :
Daxing asphalt cold patching material/asphalt cold oil (repair and filling of electric power and water conservancy pits)
Filling of power and water pipeline pits with cold asphalt/cold patching material
Gas pipeline pit repair, cold oil asphalt manufacturer
Cable trench filling is produced by a cold oil asphalt manufacturer in large quantities. Welcome to order!
Free shipping for orders over three tons around Beijing
Widely applicable:Widely used for pit repair in highways, urban roads, parking lots and other occasions, suitable for asphalt concrete pavement and cement concrete pavement.
Easy constructionSimply clean the pit to be repaired, put in cold patching material, and roll it several times with car wheels or compact it with a small vibrating compactor to open it to traffic.
Cold repair asphalt is suitable for repairing damaged parts such as roads, bridges, parking lots, airport runways, pipeline trenches, public residential areas, industrial parks, and bridge joints.
Approximately one ton of material can repair an area of:
Clean the pit thoroughly. When the pit is large, there should be neat and hard edges around and on the bottom, which is more conducive to the adhesion of the cold patching material.
Fill the pit with an appropriate amount of cold fill material. If the depth of the pit is above 8CM, it needs to be compacted layer by layer. The virtual paving height of the filling material is determined according to the degree of compaction, usually 1-2CM. For the repair of large areas of road surfaces, if the road surface is damaged or broken, the roadbed should be treated well, with a compaction degree of over 93% and corresponding bearing capacity. Then, it should be paved and compacted layer by layer. Coarse graded cold fill material specially designed for this purpose needs to be compacted with a flat compactor or. Require the repaired surface to be smooth, flat, without wheel marks, and without loose edges. The compactness is over 95%.


Cold oil asphalt construction technology
When using cold patching materials for repairing road potholes, there is no need to apply a layer of oil. The materials can be taken as needed and do not require heavy construction machinery. Depending on the different repair conditions of the road surface, impact compaction, manual compaction, or car tire rolling can be used. And the area repaired with cold patching material does not need to be closed to traffic and can be immediately opened to traffic, greatly alleviating the traffic pressure caused by road repair construction.
Application scope of cold asphalt
AfterSalesService :
Key words:- Yizhuang Cold Supplement
More Products