Shunyi District Cold Asphalt Cold Supplement/Same City Construction/Consultation on Construction Quantity per Square Meter
Shunyi District Cold Asphalt Cold Supplement/Same City Construction/Consultation on Construction Quantity per Square Meter

Shunyi District Cold Asphalt Cold Supplement/Same City Construction/Consultation on Construction Quantity per Square Meter

Category:

fine chemicals /Fine Chemicals for Construction/Other building additives

Model:

MR-100

Brand:

Haiyan Xingye

model:

MR-100

Main ingredients:

asphalt

color:

black

odor:

none

density:

tall

water-soluble:

good

Minimum operating temperature:

-30

Maximum operating temperature:

forty

shelf life:

12 months

Packing Specification:

25kg

manufacturer:

Beijing Shunyi

Retail Price

1,300.00USD


重量

kg

  • Product Description
  • model

    MR-100

    Main ingredients

    asphalt

    color

    black

    odor

    none

    density

    tall

    water-soluble

    good

    Minimum operating temperature

    -30

    Maximum operating temperature

    forty

    shelf life

    12 months

    Packing Specification

    25kg

    manufacturer

    Beijing Shunyi

    Description :

      Shunyi District Cold Asphalt Cold Supplement/Same City Construction/Consultation on Construction Quantity per Square Meter

      Factory/order delivery near Haidian District asphalt cold patching material

      Quotation for the supply of cold replenishment materials from factories near Chaoyang District

      Online ordering consultation for factories near Tongzhou cold replenishment material

      Sewage pipeline filling cold asphalt factory order

      Road paving, cold oil asphalt, same city delivery

      Beijing Shunyi Beiwu Factory First hand Supply Factory

      Construction within Beijing's Sixth Ring Road, convenient and fast delivery, free delivery for orders over five tons, welcome to order and consult! Fast delivery within Beijing city, if needed, online ordering consultation!

      Cold patching materials are suitable for road repair, pavement aging repair, asphalt pavement repair, cement road damage repair, water pipe construction repair, natural gas repair, power facility repair and compaction, manhole cover surrounding compaction and filling, expansion joint filling, warehouse and factory ground repair, parking lot and airport road repair construction.

      Advantages of using cold replenishment materials for construction: no need for heating, no need for base oil, no need for large machinery for construction, use small equipment for construction, save labor costs, convenient small bag packaging for construction, and can save materials.

      Cold patching material is suitable for repairing bridge expansion joints, heavy-duty road bridge joints, and road bends with high traffic volume.

      Suitable for repairing damaged potholes and ruts on highways and road surfaces.

      Suitable for repairing damaged potholes, excavations, underground pipeline repairs, manhole covers, and small shallow pits in front of warehouse doors on general highways and streets.

      Cold replenishment construction steps:

       clear:

      Generally, the repaired pit and surrounding gravel and waste should be cleaned up, and there should be no mud, ice or other debris in the pit.

       fill:

      Fill enough cold patching material into the pit until the filling is about 1.5cm above the ground.

      When the depth of road potholes is more than 5cm, the filling work should be done every 3-5cm as a layer, layer by layer filling and compacting layer by layer.

       Compaction:

      After laying evenly, select appropriate compaction tools and methods based on the on-site repair environment, repair area size, and depth for compaction.

       check before acceptance:

      The repaired surface of the pit should be smooth, flat, and free of wheel marks, and the edges and corners of the pit should be well compacted

      5、 Cold replenishment material construction usage:

      Compaction density: 1 cubic meter ≈ 2.3 tons

      Per square meter: bags/4/ton: bags/40

      1. Cut the broken road surface into square and straight sections

       2. Clean the ground thoroughly and compact it underneath

       3. Clean the ground thoroughly and keep it moist

       4. Pour the bagged cold replenishment material into the pit

       5. Evenly pour the cold patching material into the repaired ground

       6 cm higher than the original ground, compact the ground

       8. After compactionOpen to traffic immediately

    AfterSalesService :

    Key words:
    • Shunyi Cold Asphalt