Fully customized integrated sewage lifting pump station
Fully customized integrated sewage lifting pump station

Fully customized integrated sewage lifting pump station

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

SYPS-3000-8000

Brand:

Siyuan

Retail Price

49,000.00USD


重量

kg

  • Product Description
  • Description :

      Fully customized integrated sewage lifting pump station

      A widely used sewage lifting equipment, the new integrated sewage lifting pump station, can be fully customized according to customers and is widely used in municipal engineering, public buildings, and new towns.

      Borehole diameter: 1200mm, 1500mm, 2000mm, 2500mm, 2800mm, 3000mm, 3800mm

      Depth of well: 3-14m

      Flow rate: 50-5000L/S (recommended)

      The integrated sewage lifting pump stations produced by Yancheng Siyuan are mostly made of fiberglass as the main cylinder. This type of cylinder is sturdy, and through scientific computer-controlled processing technology, the tension and angle of the yarn to be wound are controlled, making its structural layer denser and increasing compressive strength. The special fine winding process makes the resin content of the inner layer of the felt reach 99%, and after injection molding, it reaches 75%. The resin content of the inner resin layer directly determines the corrosion resistance strength of the tank body and is not easy to age.

      Secondly, its integrated internal structure. There are ladders and maintenance platforms inside the cylinder for easy maintenance by workers. The mouth is equipped with a top cover and anti-theft device, which does not produce any odor.

      What we can understand is that traditional maintenance stations require a significant amount of manpower, material resources, and financial resources from control to equipment investment, and a construction period of at least 90-180 days to coordinate with the surrounding on-site environment. The fiberglass integrated sewage lifting pump station fundamentally solves such problems, saving 3/2 of the time, with a production period of 15-25 days, faster delivery and installation of finished products, and can be fully put into use in about a week. Users can feel the convenience of life more quickly.

      Fully customized integrated sewage lifting pump station

      The practical performance of integrated sewage pumping stations is really many, such as short construction period, long service life, small footprint, and so on. Below, we can take another look at the important components and structure of this sewage lift pump station to illustrate why customization is important for user needs.

      The pump station shaft is composed of a top cover, a fiberglass reinforced plastic (GRP) cylinder, a base, a submersible pump, a service platform, pipelines, and other parts to meet the equipment requirements for boosting and lifting drainage:

      1. Top cover; Composed of fiberglass edge cover and openable pump station cover plate.

      2. Cylinder: The wellbore section of a prefabricated pump station.

      3. Base: Connected to the concrete base plate to secure the prefabricated pump.

      4. Mechanical and electrical equipment: The integrated prefabricated pump station mechanical and electrical equipment mainly includes water pumps and their auxiliary equipment, interception and cleaning equipment, pressure pipelines, valve equipment, control systems, etc

      5. Automatic coupling system: The interface quick installation system between the submersible pump and the fixed pipeline is called an automatic coupling system.

      6. Installation and commissioning: According to the construction assembly drawings and relevant installation technical standards, install the integrated pump station that has entered the site on the specified foundation or facility, complete the process of leveling and stabilization, mechanical assembly and equipment connection, electrical wiring and testing, constant value adjustment and testing, on-site and centralized control simulation action testing, so that the integrated prefabricated pump station can reach the conditions for trial operation

    AfterSalesService :

    Key words:
    • Integrated sewage lifting pump station