Why is the integration of prefabricated sewage pumping stations done underground
Why is the integration of prefabricated sewage pumping stations done underground

Why is the integration of prefabricated sewage pumping stations done underground

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

SYPS-2000-6000

Brand:

Siyuan

Retail Price

39,000.00USD


重量

kg

  • Product Description
  • Description :

      Why is the integration of prefabricated sewage pumping stations done underground

      Many devices nowadays have been developed underground and made into buried systems. As a new type of sewage lifting pump station, the integrated sewage prefabricated pump station has also been made underground, but why is it made underground? Our traditional prefabricated pump station is a civil pump station, which belongs to an open-air sewage and rainwater lifting pump station, using customized sewage pumps for pumping and discharging. Slowly with the development of the times, followed by concrete pump stations, which use concrete pump stations as the main body, cover pump rooms, and install electrical equipment. Modern technology adopts buried installation, which integrates all mechanical and electrical equipment into one, abandons the concrete body, and replaces it with reinforced fiberglass, increasing its service life. Of course, it is also to save land resources. Sewage pump stations are small and medium-sized pump stations, but if they are placed on the ground, it will affect the appearance, occupy land, and be difficult to connect with the pipeline network. Therefore, they can only be made underground, exposing the control box for easy maintenance and operation. No impact on the surrounding environment.

      Why is the integration of prefabricated sewage pumping stations done underground

      The primary condition for making the prefabricated sewage pump station underground is to excavate the pump pit. The excavation method of the pump well (taking into account the stability of the slope, possible drainage methods, etc.) should be suitable for the current soil environment. A small collection well can be used at the edge of the pit bottom to drain water at any time and ensure that there is no accumulated water on the pit bottom surface. Excavation must be carried out according to the design drawings, and an excavation plan must be formulated. During excavation, close attention should be paid to the safety of the foundation pit. The bottom of the pump pit must be dry and free of water. If there is any, appropriate precipitation measures must be taken. Adopt appropriate foundation pit maintenance methods to avoid pump pit collapse. The bottom of the pit should be excavated flat. If necessary, a layer of stone free gravel should be laid and compacted with a compactor to achieve a compaction degree of 90% according to the compaction test results. After the excavation of the pump pit is completed, it is necessary to confirm that the on-site conditions for the inlet and outlet water pipes, connecting pipes, and cables of the pump station are met before installing the pump station.

      Yancheng Siyuan has been exploring and advancing in the field of water supply and drainage equipment. It will not rest on the historical achievements just because of a little bit of performance, but will continue to overcome obstacles, overcome technical difficulties, adapt to market demand, strive to be a pioneer, a gold and silver mountain for the company, and more importantly, for the green mountains and rivers of the motherland. It will continue to persistently strive and write the chapter of the times. We effectively treat wastewater while saving manpower and resources, achieving good sewage treatment results. At the same time, the new pump station occupies a small space and can also adopt a geographical layout, which basically does not change the surrounding environment, effectively promoting the application of pump stations and bringing people a high-quality living environment.

    AfterSalesService :

    Key words:
    • Sewage pumping station