Welding of Carbon Dioxide Storage Tanks in Heguo and the Price of Low Temperature Storage Tanks in Shandong
Welding of Carbon Dioxide Storage Tanks in Heguo and the Price of Low Temperature Storage Tanks in Shandong

Welding of Carbon Dioxide Storage Tanks in Heguo and the Price of Low Temperature Storage Tanks in Shandong

Category:

mechanical equipment/Storage and transportation equipment/storage tank

Model:

CFW30-0.8

Brand:

Zhongjie Special Equipment

model:

CFW30-0.8

material:

stainless steel

classification:

Horizontal circular plastic storage tank

capacity:

twenty-seven

storage location:

Ground storage tank

Product Usage:

Storage tank

Placement method:

horizontal storage tank

structural form:

horizontal

Processing & Customization:

yes

Applicable materials:

LNG Tank

volume:

fifty-four

Overall dimensions:

DN2400-5760-8

self-weight:

one hundred and eighty-six thousand

Place of Origin:

Heze, Shandong

container type:

The first type of pressure vessel

Special Equipment Manufacturing License Number:

A2

weight:

one hundred and eighty-six thousand

Operating Temperature:

one hundred and ninety-three

work pressure:

zero point eight

diameter:

DN2400

height:

six thousand and five hundred

type:

Anti corrosion storage tank

Retail Price

224,000.00USD


重量

kg

  • Product Description
  • model

    CFW30-0.8

    material

    stainless steel

    classification

    Horizontal circular plastic storage tank

    capacity

    twenty-seven

    storage location

    Ground storage tank

    Product Usage

    Storage tank

    Placement method

    horizontal storage tank

    structural form

    horizontal

    Processing & Customization

    yes

    Applicable materials

    LNG Tank

    volume

    fifty-four

    Overall dimensions

    DN2400-5760-8

    self-weight

    one hundred and eighty-six thousand

    Place of Origin

    Heze, Shandong

    container type

    The first type of pressure vessel

    Special Equipment Manufacturing License Number

    A2

    weight

    one hundred and eighty-six thousand

    Operating Temperature

    one hundred and ninety-three

    work pressure

    zero point eight

    diameter

    DN2400

    height

    six thousand and five hundred

    type

    Anti corrosion storage tank

    Description :

      30 cubic meters of low temperaturecarbon dioxide cylinder The key process of manufacturing is welding, and special attention should be paid to improving the toughness of welding materials, preventing coarse grains and stress concentration. The entire welding process should be strictly carried out in accordance with the welding procedure qualification. All welds are of full penetration type, and the welding materials are shown in Table 4. Welding rods should be retested for the moisture content of the coating and the diffusion hydrogen content of the deposited metal by batch.

      Before heat treatment, Class A and B welds should undergo 100% radiographic inspection and surface testing. After cutting off the temporary welding ears and tie bar partitions on the 30 square low-temperature carbon dioxide storage tank, the welding scars should be polished smooth and surface inspection should be carried out to ensure that there are no defects such as cracks on the surface.

      After the manufacturing of the carbon dioxide storage tank is completed and all inspections are carried out, in order to eliminate internal stresses caused by welding and structural stresses caused by forced assembly, reduce the tendency of brittle fracture in low-temperature containers, improve the microstructure of the heat affected zone and processing deformation zone, and enhance plasticity and toughness, overall heat treatment is required.

      Heat treatment is an important means to remove hydrogen gas from the weld metal and ensure the quality of low-temperature pressure vessels. When conducting overall heat treatment inside the furnace, the inlet temperature should not exceed 400 ℃. Heat up to 620 ± 20 ℃ and keep it at this temperature for 2 hours. The 30 cubic meter low-temperature carbon dioxide storage tank should be cooled to 300 ℃ with the furnace and then left to cool in the air. Mechanical and bending performance tests shall be conducted on welded test plates subjected to heat treatment in the same furnace, and the test results shall comply with relevant standard requirements.

    AfterSalesService :

    Key words:
    • Welding of Carbon Dioxide Storage Tanks