100 cubic meter liquefied gas storage tank factory price A2 level pressure vessel qualification manufacturer supply
Category:
mechanical equipment/Storage and transportation equipment/storage tank
Model:
WDG1.77-3200-100
Brand:
Zhongjie Special Equipment
Retail Price
156,000.00USD
重量
kg
- Product Description
-
Description :
Shandong Zhongjie liquefied petroleum gas cylinders must be inspected and qualified by nationally certified manufacturers or relevant departments before they can be used;
Before use, first check that the cylinder valve is in the closed position and there is no air leakage, then open the sealing film at the interface and connect it to the pressure reducing valve;
3. Steel cylinders should be used upright and not allowed to be placed horizontally or upside down. When connecting the pressure reducing valve to the steel cylinder, the pressure reducing valve should face upwards and maintain a horizontal position;
4. The connections of pressure reducing valves, tees, hoses, stoves, etc. should be securely fixed with pipe clamps or clamps;
5. If oil resistant rubber hoses are used to connect steel cylinders to a single liquefied gas stove, they should be fastened with clamps and the length should be controlled between 1.2-2.0 meters. The hoses should be replaced at least once every 2 years. The installation of hoses should prevent phenomena such as scratching, collision, impact, and pressure; Enterprise application - County gas management department signs opinions - Regional gas management department reviews - Regional Development and Reform Bureau issues project approval - Processing procedures for planning, land use, fire protection, meteorology, safety supervision, environmental protection, and construction departments. Hanzhong City buried 50 cubic meters of liquefied gas storage tanks and 50 cubic meters of propane storage tanks in Shandong Zhongjie - Start construction - Enterprises keep construction supervision records - Acceptance hidden

Covering the project - completion - submission of acceptance application - acceptance by relevant departments - submission of relevant legal documents to the gas management department - signing of the "Business Management Commitment Letter" with the gas management department - issuance of approval for opening documents.
General safety requirements for heat treatment operations
Before operation, it is necessary to familiarize oneself with the heat treatment process specifications and the equipment to be used.
During operation, necessary protective equipment must be worn, such as work clothes, gloves, protective goggles, etc.
3. No objects that obstruct operation shall be placed between the heating equipment and the cooling equipment.


4. Mixing carburizing agents, sandblasting, etc. should be carried out in separate rooms, and sufficient ventilation equipment should be installed.
5. Equipment hazardous areas (such as power leads, busbars, conductive rods, and transmission mechanisms of electric furnaces) should be protected with wire mesh, fences, plates, etc. 50 cubic meter liquefied gas storage tank buried in Hanzhong City, 50 cubic meter propane storage tank Shandong Zhongjie
6. All tools used for heat treatment should be placed in an orderly manner, and cracked or unsuitable tools are not allowed to be used.
7. Entrance and exit of the workshop
Every time a new steel cylinder is replaced, the cylinder valve, pressure reducing valve, and various hose interfaces should be carefully inspected to confirm that there is no air leakage before use;
7. When using the stove, there should be no red fire or backfire, and there should be no flammable materials around the steel cylinder and stove;
8. The interface of the pressure reducing valve and the sealing ring of the bottle valve should be checked regularly for damage, detachment, and aging;
AfterSalesService :
Key words:- Liquefied gas storage tank
More Products