Horizontal WNS2-1.25-Q Steam Boiler Quotation Gas Boiler National Standard Sales
Category:
mechanical equipment/Industrial boilers and accessories/Gas boiler
Model:
WNS2-1.25-Q
Brand:
Zhongjie Special Equipment
Retail Price
156,000.00USD
重量
kg
- Product Description
-
Description :
Safety precautions:When the boiler is in operation and the protection does not work in any of the following situations, the boiler should be shut down urgently: (1) The boiler water level is lower than the visible edge of the lower part of the water level gauge, and the feedwater is continuously increased and other measures are taken, but the water level continues to drop; (2) The boiler water level exceeds the high visible water level (full water), but the water level cannot be seen even after draining; (3) Soft water system malfunction, unable to feed water into the boiler and the boiler water level is below the visible edge of the lower part of the water level gauge; (4) When the boiler circulation pump fails and cannot operate normally; (5) Boiler components are damaged, endangering the safety of operating personnel; (6) When the temperature of the boiler water rises sharply and becomes uncontrollable; (7) Other abnormal situations endanger the safe operation of the boiler. two When the boiler is shut down urgently due to a water shortage accident, it is strictly prohibited to supply water to the boiler and carry out steam and sewage operations. 3. The boiler room should have good ventilation. four After the circulation pump is running normally, the burner should be restarted and the circulation system valves should be opened. Do not start the burner first, wait for the boiler to heat up before starting the circulation pump or suddenly opening the valve. five The boiler circulating pump stops running due to a malfunction and the boiler protection system is not functioning, resulting in a "dry burning" situation in the boiler. It is strictly prohibited to add water to the boiler or turn on the circulating pump.

Shutdown:1. Press the shutdown button on the operation screen to stop the combustion of the burner and close the intake valve. 2. Disconnect the power supply of the controller and the main power supply of the boiler.
Job responsibility system:1. Adhere to the work post, strictly abide by the operating procedures and other relevant rules and regulations, and ensure the safe and environmentally friendly operation of equipment. 2. Familiarize and master the structure and performance of boilers, understand and master the performance and use of auxiliary equipment, and continuously improve operational skills. 3. It is necessary to conduct frequent inspections, checks, and repairs. 4. Ensure normal gas and power supply to each computer room. 5. Ensure that sewage is discharged once a week, and regularly inspect all valves to promptly address any issues found. 6. Carry out daily inspections and maintenance of the boiler to ensure that the equipment is in good condition and operates safely. 7. Responsible for indoor and outdoor environmental sanitation work, timely discharge and flush the liquid level gauge, and create a good working environment. 8. Strictly implement the shift handover system and fill in the operation log carefully.
Patrol inspection and regular inspection system:1. Personnel on duty must inspect the equipment of their position on time according to the patrol inspection roadmap. During the patrol inspection, the main focus is on checking whether the various parameters of the equipment are normal, whether there are abnormal sounds, whether the equipment vibration is abnormal, whether the water supply in the water tank is sufficient, whether the combustion condition in the combustion chamber is normal, whether there is any odor or ignition in each control cabinet and motor, and recording the inspection results. During the patrol inspection, if any abnormal situation is found, it should be dealt with in a timely manner. If it cannot be handled, the department leader should immediately assist in handling it. When conducting inspections, the buttons of the work clothes should be fastened and the cuffs should be tightly tied to prevent accidents. 5. Boiler maintenance personnel should strictly follow relevant regulations to conduct regular inspections of equipment. 6. During regular inspections, any problems found should be dealt with promptly. If they cannot be dealt with in a timely manner, they should be reported to the relevant person in charge and time should be arranged to handle them as soon as possible.


AfterSalesService :
Key words:- steam boiler
More Products