Shandong waste heat boiler design and manufacturing manufacturer, waste heat boiler quotation unit, waste heat flue gas utilization
Category:
mechanical equipment/Industrial boilers and accessories/Waste heat boiler
Model:
q2-1.25
Brand:
Zhongjie Special Equipment
Retail Price
98,000.00USD
重量
kg
- Product Description
-
Description :
electric control system
Overview
This control cabinet has a beautiful appearance, compact structure, and easy operation. The stoker can operate it according to the instructions on the label on the panel. The control cabinet panel is equipped with start and stop buttons for electric equipment, as well as indicator lights to indicate the working status of the electric equipment. loaded withIntelligent computer controllerThis controller can achieve automatic control of the boiler.
two Precautions for Electrical Installation and Use
This control cabinet can operate reliably under the following conditions.
1. Altitude: not exceeding 2000 meters.
2. The ambient air temperature is -5 ℃~+40 ℃, and the average temperature within 24 hours does not exceed+35 ℃.
3. Atmospheric conditions: The relative humidity of the air should not exceed 50% at high temperatures of+40 ℃, and higher relative humidity is allowed at lower temperatures; The average low temperature of a wet month should not exceed+25 ℃, and the average relative humidity of the month should not exceed 90%. Measures should be taken to remove condensation that occurs on the product due to temperature changes.
4. Avoid direct sunlight and do not use outdoors directly.
5. In a medium without explosive hazards, and where there are no gases or conductive dust present that can corrode metals or damage insulation.
6. Installation conditions: In places with rain and snow protection facilities and not filled with water vapor.
7. The inclination between the installation surface and the vertical surface shall not exceed ± 5 °.
8. Impact vibration: This product must be installed and used in a place without significant shaking, impact, and vibration.
During installation, the distribution cabinet must be strictly grounded, with a grounding resistance of ≤ 1 ohm and a grounding area of no less than 25 square millimeters
10. Electrical requirements: Three phase four wire system Operating voltage: 380V ± 5% Frequency: 50HZ





AfterSalesService :
Key words:- waste heat boiler
More Products