Thermal oil boiler manufacturers supply special equipment for thermal oil boilers
Category:
mechanical equipment/Industrial boilers and accessories/Gas boiler
Model:
YYQ4600
Brand:
Zhongjie Special Equipment
Retail Price
140,000.00USD
重量
kg
- Product Description
-
Description :
1. The outer skin of the He Guo gas boiler is made of white color steel plate, which is durable and has excellent mechanical and process performance. (High end version)
Stainless steel mirror panel available for purchase)
2. Externally coated with polyurethane paint, the paint film is strong and tough, with a full gloss, strong adhesion, water resistance, wear resistance, and corrosion resistance.
The appearance of the boiler is beautiful and elegant. The panel support adopts medium gray paint: stable and pragmatic.
1、 Compact structure, fully assembled boiler factory, easy to install;
2、 The boiler has a high degree of self-control, programmable computer control, Chinese display screen, fully automatic operation, and automatic manual switching;
3、 Every boiler undergoes a high-pressure flue gas leakage test before leaving the factory to ensure perfect operation for the user.
Smoke box: 1. Adopting dual stage sealing, no smoke leakage;
2. The welding of the smoke box adopts surface inspection to prevent smoke leakage and prevent condensation water from corroding the skin.
4、 Adopting top mounted gravity explosion-proof door:
1. Constant opening pressure
2. Explosion proof door cover with double sealing structure, tightly sealed;
3. The disassembly and restoration of the inspection door are simple and do not require high personnel requirements;
4. The pressure relief area is large, making the boiler safer;
5. Safe when releasing pressure, the hot air sprayed out will not harm people
5、 The support of the boiler is fixed at one end and slides at the other end. When the boiler operates from cold to hot state, it can expand and contract freely without any constraint stress, making it safer.
1. The steel plates selected for the He Guo gas boiler are all steel plates determined by the large factory, and the steel plates are determined according to the boiler design drawings, striving to reduce the number of welds.
2. After the steel plate arrives at the factory, it undergoes ultrasonic re inspection and can only be stored if it is qualified. If it is unqualified, it can be returned directly.
3. The explosion-proof door is connected to the combustion chamber and extends above the boiler body, with a compact structure to ensure that in case of explosion in the furnace,
Completely release pressure without causing harm to people.
5. Smoke box: We use two-stage sealing, the first stage is asbestos tape, the second stage is aluminum silicate fiber rope, and the front and rear smoke boxes
All are designed for fully enclosed smoke boxes and undergo sealed pressure smoke tests to ensure that high-temperature smoke can wash away without leaking!
Customers will not be loyal to any company, they will only be loyal to the value that this company provides them!
All marketing activities must enter into customer value, which must be to provide assistance to customers, solve customer problems, resolve customer confusion, and achieve customer dreams. The problems, needs, and confusion of our customers are the reason and opportunity for our existence!
The purpose of all activities is to provide value to customers, realize their dreams, contribute results, and solve problems.
What customers purchase is not the product, but the solution to the problem!
I won't stop my service just because customers haven't bought my product!
Our company will make unremitting efforts, actively strive for progress, continuously innovate, use advanced technology, and continuously develop boiler products that meet market needs to meet the living and production needs of consumers.

AfterSalesService :
Key words:- gas boiler
More Products
