Directly buried drainage device steel sleeve steel directly buried drainage joint prefabricated insulation drainage joint support drawing customization
Category:
building materials/Pipe fittings/seamless steel tube
Model:
three hundred and seventy-seven
Brand:
Baosteel
brand:
Baosteel
model:
three hundred and seventy-seven
production process:
Cold drawn tube
cross-sectional shape:
round tube
connection method:
welded type
purpose:
high-pressure boiler tube
wall thickness:
five
outer diameter:
five hundred and thirty
nominal diameter:
three hundred and seventy-seven
length:
twelve
grade:
Xingsong
Is it imported:
No
Processing Service:
customized sample
quality grade:
genuine product
delivery service:
Can be delivered to the factory
Type of goods sales:
spot
weighing method:
theoretical weight
Specifications:
168*8
Product surface description:
The drainage system should be installed at the drainage port of the compensator or as close as possible to the fixed bracket. If the drainage system is installed on a pipeline, a water collection tank should be installed on the pipeline first, and then led out with a metal hose. Two branch pipes are listed in the drainage operation well, one for starting drainage and the other for continuous drainage. Upstream drainage type insulated drain joint, thermal static type drain valve with membrane box, corrugated pipe, bimetallic plate, etc. Drain valve in steam heating system
manufacturer:
three hundred and seventy-seven
Retail Price
568.00USD
重量
kg
- Product Description
-
brand Baosteel
model three hundred and seventy-seven
production process Cold drawn tube
cross-sectional shape round tube
connection method welded type
purpose high-pressure boiler tube
wall thickness five
outer diameter five hundred and thirty
nominal diameter three hundred and seventy-seven
length twelve
grade Xingsong
Is it imported No
Processing Service customized sample
quality grade genuine product
delivery service Can be delivered to the factory
Type of goods sales spot
weighing method theoretical weight
Specifications 168*8
Product surface description The drainage system should be installed at the drainage port of the compensator or as close as possible to the fixed bracket. If the drainage system is installed on a pipeline, a water collection tank should be installed on the pipeline first, and then led out with a metal hose. Two branch pipes are listed in the drainage operation well, one for starting drainage and the other for continuous drainage. Upstream drainage type insulated drain joint, thermal static type drain valve with membrane box, corrugated pipe, bimetallic plate, etc. Drain valve in steam heating system
manufacturer three hundred and seventy-seven
Description :












AfterSalesService :
Key words:- Directly buried drainage device
More Products