Steel skeleton lightweight floor slab, Jiangsu Huai'an supplier, all atlas customization
Steel skeleton lightweight floor slab, Jiangsu Huai'an supplier, all atlas customization

Steel skeleton lightweight floor slab, Jiangsu Huai'an supplier, all atlas customization

Category:

building materials/Waterproof and fireproof functional materials/insulation material

Model:

Custom Drawing

Brand:

Shen Bo

model:

Custom Drawing

material:

Cement foaming

Soft and hard conditions:

hard

Retail Price

180.00USD


重量

kg

  • Product Description
  • model

    Custom Drawing

    material

    Cement foaming

    Soft and hard conditions

    hard

    Description :

      Steel skeleton lightweight floor slab, Jiangsu Huai'an supplier, all atlas customization

      The main materials of steel frame lightweight panels are natural inorganic materials, which do not release harmful substances, and the panels have good breathability, making living healthy and comfortable; Part of the industrial waste can be utilized in production, which belongs to the product of comprehensive resource utilization. Therefore, steel frame lightweight panels have their own specialized construction techniques.

      Material selection and construction of lightweight steel frame panels

      The carefully designed combination of the law enables its service life to reach 50 years;

      The core plate is made of inorganic material, with good stability, anti-aging and service life equal to that of concrete material;

      The diameter of the steel wire at the bottom of the board is 3mm or more, the thickness of the protective layer is 20mm or more, and the moisture absorption rate is less than 0.1%.

      A steel frame lightweight slab that combines all its advantages certainly requires a good construction process. So, what is the construction process for steel frame lightweight slabs?

      Construction Technology of Steel Skeleton Lightweight Plate

      Laying out → Installation of lightweight boards → Adjustment of board seam distance → Welding → Jointing → Waterproof coating → Acceptance.

      Laying out: After the handover with the previous process is completed, according to the layout diagram, lay out the position of the board edge, and at the same time check whether the layout diagram intersects with the on-site structure.

      High strength:

      Modified cement perlite composite core material, with a bulk density of less than

      So that the weight of the entire board is only about the same as that of traditional concrete materials

      Adopting light steel frame and high-strength

      The combination structure of inorganic lightweight core materials, although it is a lightweight slab, maintains the characteristics of high bearing capacity and high safety of traditional reinforced concrete heavy-duty slabs. It can meet the requirements of uniformly distributed loads and has strong concentrated bearing capacity, making it an ideal material to replace traditional concrete roof panels and floor slabs.

      The carefully designed combination of material selection and construction methods ensures that the product design service life can reach

      Annual installation: Use lifting equipment to gently place the lightweight board onto the steel frame nearby. When the crane cannot be directly positioned, lift the lightweight board onto a specially designed roof transport truck and then move it to the installation position.

      Adjust the distance of the board joint: According to the requirements of Beijing 05sg3, adjust the board joint to the allowable deviation range, and the width deviation of the board joint shall not exceed 10mm.

      Welding: After installation, according to the connection requirements of the "Steel Skeleton Lightweight Plate Atlas" Jing05sg3 for steel skeleton lightweight plates, weld the plate to the steel roof truss.