Small concrete anchor spraying machine, Jingheng tunnel spraying machine
Small concrete anchor spraying machine, Jingheng tunnel spraying machine

Small concrete anchor spraying machine, Jingheng tunnel spraying machine

Category:

mechanical equipment/Engineering machinery, construction machinery/Concrete machinery

Model:

PZ-5/PZ-7

Brand:

Jingheng

Retail Price

6,000.00USD


重量

kg

  • Product Description
  • Description :

      Spraying machines are generally used for underground operations in mining areas, also known as wet spraying machines for mining. In fact, concrete sprayers have a wide range of uses. In addition to being used in mining areas, they can also be used for daily care such as irrigation, fertilization, pesticide spraying, and soil improvement work. In addition, wet spraying machines are also suitable for greening and spraying in places where plant growth is difficult, such as rocks, hard soil, sandy soil, barren land, acidic soil, arid areas, and coastal dams. They are used for highway slope greening, high-speed railway side greening, mine greening, ecological restoration, desert control and other projects.

      Small concrete anchor spraying machine, Jingheng tunnel spraying machine

      Here, Jingheng tells you the issues to pay attention to when testing a mining concrete spraying machine: (1) When testing a mining spraying machine, the switch and bell should be placed around the brake handle for easy operation; (2) Perform two to three forward and reverse car tests; (3) For neatly arranged drum steel wire ropes, small hammers or handle hooks should be used for the ropes, without hands or feet along the rope to prevent the ropes from tangling; (4) Connect with the drawing work signal to verify its accuracy. Concentrate, hear the signal clearly, drive, stop, and reverse according to the signal on the blueprint. When driving, stand in the column behind not far from the winch. When parking normally, do not collide with the parking lot after the mechanical parking brake fails. Motor bearings, if the temperature exceeds 65 ℃, stop investigating the cause and wait for the temperature to drop before starting. Signal work precautions: (1) Supported commands for fast and accurate signal transmission; (2) Focus on paying close attention to the direction of the steel wire rope. When the direction of the steel wire rope is wrong, the signal should be immediately stopped and the correct signal should be issued; (3) Always maintain a distance of 5 to 8 meters for signal and drawing work, and delay the change in working position with the pillar position, and turn off the cable; (4) When adjusting the work position, hold the signal device and do not raise the signal line to avoid damaging the signal line connection and causing accidents.

    AfterSalesService :

    Key words:
    • Concrete anchor spraying machine