Sales of Ningxia waterproof board climbing welding machine and geomembrane welding machine
Sales of Ningxia waterproof board climbing welding machine and geomembrane welding machine

Sales of Ningxia waterproof board climbing welding machine and geomembrane welding machine

Category:

mechanical equipment/Welding and cutting equipment/Plastic welding machine

Model:

JH10/JH15/JH20

Brand:

Jingheng

Retail Price

2,700.00USD


重量

kg

  • Product Description
  • Description :

      Sales of Ningxia waterproof board climbing welding machine and geomembrane welding machine

      The principle of the protective measures adopted by our company's specially developed climbing welding machine for leakage is that the climbing welding machine can be used normally without water. If water appears on the ground during the use of the climbing welding machine, it will trip as soon as it is used. Our company uses trip protection to inform everyone that there is leakage in the shell of the climbing welding machine equipment. If you want to solve this problem, just place a board at the bottom of the climbing welding machine mechanical equipment to use it normally. If there is a leakage in the climbing welding machine and the use of a pad is not feasible, and the fault phenomenon is different from the one above, it is highly likely that the internal parts of the climbing welding machine have been damaged. In this case, it is generally necessary to send the mechanical equipment to the electrical tool store maintenance department for repair. If there is a problem with the parts, our company has a dedicated supply of parts and accessories. Please feel free to contact our customer number at any time.

      Attention should be paid to issues during the construction of climbing welding machines. When laying HDPE geomembrane, expansion deformation should be reserved according to local temperature changes. The overlapping width of geomembrane laying should not be less than 10cm. There should be no oil stains or dust at the joints. The overlapping surface of HDPE fish pond anti-seepage membrane should be free of sediment, condensation, moisture and other debris. If there are any debris, they must be cleaned thoroughly before welding. Before welding, a stable and good voltage power supply should be used. In special cases, a voltage regulator must be used when using a local power supply. The climbing welding machine should be preheated before welding. When the anti-seepage membrane needs to be spliced or spliced for a long time, horizontal welds should be made first, followed by vertical welds. When the spacing between transverse welds is greater than 50cm, T-shaped welds should be used instead of transverse welds. Welding requires neatness, aesthetics, and no slipping or jumping welding phenomena. After the climbing welding machine completes the welding, a gas pressure detector should be used to inspect the welded joints to ensure that each joint is firmly welded.

    AfterSalesService :

    Key words:
    • Waterproof board climbing welding machine