Evacuation shed and mobile explosive storage room for blasting engineering
The LG box is composed of more than 6 panels, and the installation of the ZY storage warehouse requires more than 4 workers. First, measure the room and determine the installation position of the mobile ZY cabinet room. Starting from one corner of the mobile ZY cabinet, assemble the two side panels of one corner with bolts (only lock the upper and lower bolts first). Installing the side panels on the corner first can form a 90 degree angle, which is not easy to fall over. Let a worker support the already installed part of the warehouse to prevent the danger of collapse. Then install adjacent panels from both sides and lock them with bolts until the last side panel is left. Start installing the bottom plate and lock the floor bolts so that each corner surrounded by the side panels of the warehouse is 90 degrees? After the bottom plate is installed, the remaining side plates should be installed and all bolts should be locked. Then, the top plate of the mobile ZY cabinet room should be installed, and the loading warehouse should be assembled.