KY-6075 fully hydraulic tunnel drilling rig, metal mine fully hydraulic steel cable coring exploration drilling rig
KY-6075 fully hydraulic tunnel drilling rig, metal mine fully hydraulic steel cable coring exploration drilling rig

KY-6075 fully hydraulic tunnel drilling rig, metal mine fully hydraulic steel cable coring exploration drilling rig

Category:

mechanical equipment/Geological and mineral survey equipment/Drilling machine

Model:

KY-6075

Brand:

Liheng Machinery

Retail Price

5,000.00USD


重量

kg

  • Product Description
  • Description :

      KY-6075 fully hydraulic tunnel drilling rig, metal mine fully hydraulic steel cable coring exploration drilling rig

      1KY-6075Steel cable coring exploration drilling rigModel Description

      K: Tunnel; Y: Hydraulic controlled mechanical transmission; 60mm -75mm: Drilling into rock aperture.

      IIKY-6075Steel cable coring exploration drilling rigworking conditions

      The fully hydraulic steel cable coring exploration drilling rig is suitable for use in chambers with intact roof, no breakage, no quicksand, and no support.

      1. Horizontal forward drilling: The chamber requires a height of 2000mm and a width of 2000mm;

      2. Horizontal horizontal drilling: The chamber requires a height of 2000mm and a width of 4000mm;

      3. Vertical up and down angle drilling: The chamber requires a height of 4000mm and a width of 2000mm.

      IIIKY-6075Steel cable coring exploration drilling rigfeature

      1. Small size, light weight, easy installation, 360 ° drilling with steel cable for core extraction, lifting rock core without lifting drill rod.

      2. Three major components: main engine, pump station, and control panel.

      3. The original transportation and exploration tunnels can be put into production, providing protection for the overall structure of the mine. It can also be used for surface drilling at 0-90 degrees.

      4. The drilling rig layout is flexible, and the mechanized twisting and unloading of drill rods reduces the labor intensity of workers and improves work efficiency.

      5. Adopting a box type feeding frame, clamping device is tightened, the power head rotates for drilling, and the oil cylinder pulls the drilling tools, saving the bulky drilling tower.

      6. It has linkage performance, centralized control through the console, simple and safe, and can achieve infinite speed regulation.

      7. Hollow shaft design, the length of the drill rod is not limited by the drilling process of the drilling rig.

      8. Good disintegration and convenient relocation and transportation. The drill bits ranging from 49 to 60 can be used on the same machine, and replacement takes 15 minutes.

      9. Centralized operation console for oil pump, water pump, and power supply.

      10. Pull type columns, suitable for tunnels of varying heights.

      11. The oil gauge line is capable of withstanding high pressure and is flexible, reducing the impact of high-pressure oil veins and ensuring the stability of the hydraulic oil gauge pointer. It can promptly detect changes in the formation and rocks inside the hole.

      12. Customized oil temperature cooler, fast cooling of high-pressure oil, low-temperature use, can protect the service life of motors, oil pumps, and rubber seals.

      4KY-6075Steel cable coring exploration drilling rigadvantage

      1. Reduce the auxiliary time for lifting drill rods, increase the pure drilling time, and the deeper the drilling, the more obvious the economic effect.

      2. Reduce physical labor for workers.

      3. Core blockage can be immediately removed to improve the recovery rate of rock and mineral cores.

      4. Reduce the wear and tear of drill pipe threads, extend the service life of drill pipes, and reduce pipe consumption.

      5. Reduce the wear and tear, unscrewing, and collision with the hole wall of the drill bit, and extend the life of the drill bit.

      6. Reduce the suction of flushing fluid and the imbalance of pore wall pressure, thereby reducing accidents inside the pore.

      7. Reduce mechanical wear during drilling and increase the service life of the drilling rig.

      8. Reduce borehole curvature and improve borehole quality.

      9. It is beneficial for drilling into complex formations and avoiding the collapse and falling of the borehole wall.

      10. Steel cables can be used to place inclinometers inside the drill pipe for inclinometer measurement.

    AfterSalesService :

    Key words:
    • Fully hydraulic tunnel drilling rig