Mobile Quick Installation Scaffolding for Power Construction -4-meter Fully Insulated Scaffolding for Power Construction - Scaffolding Manufacturer
Mobile Quick Installation Scaffolding for Power Construction -4-meter Fully Insulated Scaffolding for Power Construction - Scaffolding Manufacturer

Mobile Quick Installation Scaffolding for Power Construction -4-meter Fully Insulated Scaffolding for Power Construction - Scaffolding Manufacturer

Category:

building materials/Geosynthetic materials/Scaffolding and its accessories

Model:

KLD-4 meters

Brand:

Kelida Electric Appliances

Retail Price

3,200.00USD


重量

kg

  • Product Description
  • Description :

      Kelida Brand - Quick Installation Scaffolding Construction Method and Precautions:

      1. All materials used for the construction of high-rise scaffolding must meet quality requirements.

      2. The foundation of high-rise scaffolding must be firm, calculated before erection, meet the load requirements, and erected according to construction specifications, with proper drainage measures.

      3. The technical requirements for scaffolding construction should comply with relevant regulations.

      4. It is necessary to attach great importance to various construction measures, such as diagonal braces and tension nodes, which should be set according to requirements.

      5. Horizontal closure: Starting from each step, every one or two steps, fully lay the scaffold board or scaffold fence. The scaffold board should be laid along the length direction, and the joints should overlap and be placed on the small horizontal bar. It is strictly prohibited to have empty boards. And lay a safety bottom fence every four steps between the inner pole and the wall.

      6. Vertical closure: From the second step to the fifth step, a 1.00m high protective railing and toe board or net should be set up on the inner side of the outer row of poles, and the protective pole (net) should be securely fastened to the pole; In addition to setting up protective barriers, all safety fences or safety nets should be installed above the fifth step; Starting from the second step, safety fences or safety nets should be installed on all sides along the street or in densely populated residential areas.

      7. Scaffolding should be erected at a height of at least 1.5 meters above the top of the building or operating surface, and should be enclosed.

      8. The steel pipes, fasteners, scaffolding boards, and connection points on the completed scaffold shall not be dismantled at will. When necessary during construction, it is necessary to obtain the consent of the site manager and take effective measures. After the completion of the process, it must be immediately restored.

      9. Before using the scaffold, the person in charge of the construction site should organize inspection and acceptance. Only after passing the acceptance and filling out the inspection form can it be used. During the construction process, there should be management, inspection, and maintenance, and regular settlement observation should be conducted. If any abnormalities are found, reinforcement measures should be taken in a timely manner.

      10. When dismantling scaffolding, the connection with the building should be checked first, and any remaining materials, debris, etc. on the scaffolding should be cleaned up. From top to bottom, the dismantling should be carried out in the order of installation before dismantling, and then installation before dismantling. The dismantled materials should be uniformly transferred or lifted to the ground step by step. It is not allowed to use the step dismantling method, and it is strictly prohibited to throw down or use the pushing (pulling) method to dismantle.

      11. When dismantling scaffolding, a warning area should be set up and a dedicated person should be assigned to guard it. In the event of strong winds of level six or above and adverse weather conditions, scaffolding installation and dismantling work should be stopped.

      12. For the requirements of the foundation, if the foundation is uneven, please use adjustable base feet to achieve balance. The foundation must have the ability to withstand the pressure of scaffolding and work.

      13. Staff must wear safety belts during construction and high-altitude work, and safety nets should be installed around the work area to prevent heavy objects from falling and injuring others.

      14. The components and accessories of scaffolding must not be seriously dropped or bumped during transportation and storage; When overlapping or disassembling, it is strictly prohibited to throw it from a high place. When disassembling, it should be done in order from top to bottom.

      15. Pay attention to safety during use, strictly prohibit playing and frolicking on the shelf, and prevent accidents from happening.

      16. Although work is important, safety and life are even more important. Please remember the above content.

    AfterSalesService :

    Key words:
    • Fully insulated scaffolding for power construction