Scenic area wheeled small train tourism sightseeing train amusement facilities electric small train
Scenic area wheeled small train tourism sightseeing train amusement facilities electric small train

Scenic area wheeled small train tourism sightseeing train amusement facilities electric small train

Category:

Transportation/Electric vehicle/Electric sightseeing vehicle

Model:

Tire train

Brand:

Borui Te

Retail Price

10,000.00USD


重量

kg

  • Product Description
  • Description :

      When the ignition pressure of the sightseeing small train (steam small train) locomotive rises to 100-200Kpa, before assembling the steam chamber valve and front cover, a guide tube is installed in the steam chamber and temporarily fastened to the cutting wire of the steam chamber front cover. The locomotive is braked, and then the steam valve is opened slightly to completely spray out the rust in the superheated pipe. After that, the guide tube is removed and the steam chamber valve and front cover are installed. Do not leak tight, strictly follow the safety technical operation procedures when tightening. Before adding water, check whether the maintenance of the steam department has been completed. Before adding water, pay attention to the water level of the water meter. When the water level of the water meter reaches 20-50mm, stop adding water. If there is not much water in the coal water tank, add water to the tank and implement customized management. Delivery and trial operation method: Adjust the safety valve according to the requirements of the steam locomotive maintenance regulations. Check for leaks in boiler accessories, cleaning blockages, etc., and ensure that they function properly and flexibly. Conduct a brake function test to check the function of each pneumatic component and the condition of the air pump. Adjust the center of the reversing machine. Cooperate with the driver for trial operation, check the cylinder clearance, chamber valve, brake, and other conditions. Check whether the mechanical and running parts are working properly and normally. Homework requirements: Strictly follow the safety technical operation procedures; Repair defective parts and locations without running, dripping, or leaking. Free from leaks, with flexible, accurate, and reliable functions such as large and small dampers and air meters. Please have quality inspectors inspect and accept them; Three hearts in agreement; All departments are doing well in their work, and there is no heating phenomenon in each axle pin; Repair in case of abnormalities.

    AfterSalesService :

    Key words:
    • Scenic area wheeled small train