Zhengzhou reactor resin production equipment has a long service life
Zhengzhou reactor resin production equipment has a long service life

Zhengzhou reactor resin production equipment has a long service life

Category:

chemical industry/Reaction equipment/Reaction kettle

Model:

Brand:

Jinzong Machinery

Retail Price

Negotiable


重量

kg

  • Product Description
  • Description :

      Regular attention should be paid to the working condition of the entire equipment and reducer when maintaining the stainless steel reactor. If the reducer lubricating oil is insufficient, it should be replenished immediately. The electric heating medium oil should be replaced every six months. Safety valves, pressure gauges, distillation holes, electric heating rods, electrical instruments, and other parts such as the jacket and pot cover should be regularly inspected. If there is a malfunction, they should be replaced or repaired immediately. When the equipment is not in use, it is necessary to thoroughly clean the inner and outer walls of the container with warm water, regularly scrub the pot body, keep the exterior clean and the inner pot bright, and achieve durability.

      Maintenance of reaction kettle

      (1) Installation location: The reaction vessel should be installed in a high-pressure operating room that meets explosion-proof requirements. When multiple reaction vessels are equipped, they should be placed separately, and a safe explosion-proof wall should be used to separate each two vessels. Each operating room should have a passage and outlet to the outside, and good ventilation should be ensured when explosive media is present.

      (2) After opening the packaging, check for any damage to the equipment. Install the equipment according to the structural diagram based on the equipment model, and verify the components provided according to the packing list. If the heating method is thermal oil electric heating, please purchase the corresponding model of thermal oil according to the operating temperature (note: thermal oil does not allow moisture) and add it. When adding, open the oil filling port on the upper part of the jacket and the oil level port on the upper part of the jacket. Add oil through the filling port until the oil level flows out; Twist the oil level port tightly afterwards, do not twist the oil filling port tightly to avoid pressure.

      (3) Installation and sealing of kettle body and kettle cover: The kettle body and kettle cover are in line contact with the circular arc surface using gaskets or conical surfaces, and are tightly pressed against each other by tightening the main nut to achieve a good sealing effect. When tightening the nut, it must be diagonally symmetrical and gradually tightened multiple times with even force. It is not allowed for the kettle cover to tilt to one side to achieve a good sealing effect. When tightening the main nut, do not exceed the specified tightening torque range of 40-120N. M to prevent the sealing surface from being crushed or overloaded for wear. Special care should be taken for the sealing surface. Before each installation, use a soft paper or cloth to wipe the upper and lower sealing surfaces clean, and be careful not to touch the sealing surfaces of the kettle body and lid. If operated reasonably, it can be used more than tens of thousands of times. After the sealing surface is damaged, it needs to be reprocessed and repaired to achieve good sealing performance. When disassembling the kettle cover, it should be slowly lifted up and down to prevent the sealing surfaces between the kettle body and the kettle cover from colliding with each other. If gaskets (PTFE, aluminum, copper, asbestos, etc.) are used for sealing, a good sealing effect can be achieved by tightening the main nut.

      (4) The installation of valves, pressure gauges, and safety valves achieves a sealing effect by tightening the positive and negative nuts. The circular sealing surfaces at both ends of the connection must not rotate relative to each other. When assembling all screw connections, lubricant or graphite mixed with oil must be applied to prevent them from biting. The use of valves: Needle valves are line sealed, and good sealing performance can be achieved by gently rotating the valve needle and compressing the sealing surface. Excessive force is prohibited to avoid damaging the sealing surface.

      (5) After the equipment is installed, introduce a certain amount of nitrogen and maintain pressure for 30 minutes to check for any leaks. If any leaks are found, use soap foam to locate the leakage points in the pipelines and pipe openings. After finding them, release the gas and tighten them. Then, conduct a nitrogen pressure test again to ensure that there are no leaks before starting normal operation.

      The reaction kettle is an indispensable anti-corrosion equipment in the chemical industry. Mechanical collisions, sudden temperature changes, and other factors often cause porcelain detachment, cracks, bubbles, pores, and other damage to the glaze during use. These defects are never allowed in enamel equipment, and once this phenomenon occurs, it must be repaired. The on-site repair agent of Fushilan polymer composite material is a two-component composite material composed of polymer, alloy steel powder or wear-resistant ceramic powder as the substrate, and a curing agent. Compared with ordinary resin based repair agents, polymer composite materials rely on their finer polymer structure, which gives the material stronger adhesion and excellent corrosion resistance. Polymers can even penetrate into metals, forming a tighter polymer composite protective layer. Repair process: surface cleaning → rust removal → anhydrous alcohol cleaning → Fushi Blue coating bottom repair agent → Fushi Blue coating surface repair agent → curing → use.

    AfterSalesService :

    Key words:
    • Zhengzhou Reactor