Prefabricated pump station Yunnan fiberglass winding integrated prefabricated pump station
Category:
Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment
Model:
JZPPS-2-8-20/3
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZPPS-2-8-20/3
pump power:
twenty
Flow meter specifications:
one hundred and fifty
Diameter of water outlet pipe:
five hundred
Inlet pipe diameter:
seven hundred
Processing & Customization:
yes
voltage:
three hundred and eighty
power:
twenty thousand
water temperature:
0-60
Device Name:
Prefabricated pump station
Overall dimensions:
200X800
Wastewater treatment capacity:
one hundred and fifty
Specifications:
2X8m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
26,000.00USD
重量
kg
- Product Description
-
model JZPPS-2-8-20/3
pump power twenty
Flow meter specifications one hundred and fifty
Diameter of water outlet pipe five hundred
Inlet pipe diameter seven hundred
Processing & Customization yes
voltage three hundred and eighty
power twenty thousand
water temperature 0-60
Device Name Prefabricated pump station
Overall dimensions 200X800
Wastewater treatment capacity one hundred and fifty
Specifications 2X8m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Prefabricated pump stationThe fiberglass winding type is connected to the pipeline. When backfilling the foundation pit to the lower surface of the connecting pipe, the backfill surface is compacted before starting to connect the pipeline. It is not allowed to install pipelines and flexible joints without compacting the bottom of the pipe. Before installing the pipeline, it is necessary to check and ensure that all connections in the pump station have been tightened (which may loosen during transportation). The inlet and outlet pipes must be inspected according to the following items. The pipeline and sealing ring must be clean, and the inlet and outlet pipes must be aligned with the connection through a compensator. The sealing condition (to ensure tight sealing), the alignment pipe (no pressure), and symmetrically and evenly tightened. Other accessories of GPR fiberglass wrapped integrated prefabricated pump station, such as ventilation pipes, are provided and shipped in bulk and installed on site. The expensive maintenance costs caused by the failure of pump station installation are usually due to the following reasons: the underground backfill soil is not compacted, resulting in stress on the inlet and outlet pipelines. The external pipelines connected to the pump station were not properly supported, resulting in stress and damage to the inlet and outlet water pipelines of the pump station. When starting to backfill, the truck poured the material from one side, causing the tank to be subjected to unilateral force, resulting in deformation, leakage, and damage. If the cement base is uneven, the pump station will tilt, which will result in tank rupture or leakage. Larger stones falling into the backfill pit and rolling against the tank wall of the pump station will damage the tank body. If the excavation plan is not thorough or non-existent, it can easily lead to incorrect operation steps in the excavation work, which can cause the cement base to shift after installation and damage the pump station. If the backfilling is not well planned, groundwater will breed and eventually push the pumping station upwards due to its own water level.
Maintenance of fiberglass wrapped integrated prefabricated pump station: Annual inspection of main equipment such as pumps, grilles, valves, control cabinets, and the overall appearance of the pump station. If the pump station is equipped with a basket grille, it needs to be regularly lifted and cleaned according to the actual situation of the incoming water quality, and the lubricating oil and worn grinding grille blades should be replaced regularly according to the requirements of the equipment manufacturer. Regularly check the phase to phase resistance balance and insulation resistance value according to the requirements of the equipment manufacturer. Regularly replace spare parts according to the requirements of the equipment manufacturer. Stop the pump station for major repairs every 5 years or upon special request.



AfterSalesService :
Key words:- Prefabricated pump station
More Products