Prefabricated pump station villa integrated sewage lifting prefabricated pump station
Category:
Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment
Model:
JZPPS-3-9-20/3
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZPPS-3-9-20/3
pump power:
twenty
Flow meter specifications:
one hundred and twenty
Diameter of water outlet pipe:
six hundred
Inlet pipe diameter:
one thousand
Processing & Customization:
yes
voltage:
three hundred and eighty
power:
twenty thousand
water temperature:
0-60
Device Name:
Prefabricated pump station
Overall dimensions:
300X900
Wastewater treatment capacity:
one hundred and eighty
Specifications:
3*9m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
28,000.00USD
重量
kg
- Product Description
-
model JZPPS-3-9-20/3
pump power twenty
Flow meter specifications one hundred and twenty
Diameter of water outlet pipe six hundred
Inlet pipe diameter one thousand
Processing & Customization yes
voltage three hundred and eighty
power twenty thousand
water temperature 0-60
Device Name Prefabricated pump station
Overall dimensions 300X900
Wastewater treatment capacity one hundred and eighty
Specifications 3*9m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Prefabricated pump stationThe villa sewage lifting pump station adopts proprietary sewage isolation and discharge technology, which does not require cutting and crushing, saves energy, and has lower power for the same amount of sewage lifting equipment. The overall overcurrent capacity of the equipment is extremely strong, and the overcurrent capacity of the sewage lifting pump station is not limited by the water pump. Odorless and odorless, with fully enclosed equipment design. Small size, flexible installation, saving no investment cost in civil engineering, and reducing construction costs. The sewage lifting pump station adopts a turbine swirl impeller. Especially suitable for use in places where multiple toilets are connected to a sewage pumping station. Lifting equipment for the same level drainage system. By utilizing the filtering function of the equipment, impurities and solid particles in the sewage are cleverly trapped in the impurity deposition chamber. When the water level in the collection tank reaches the set pump start water level, the sewage pump starts to discharge the collected water in the tank together with the impurities in the sedimentation chamber to the outdoor drainage inspection well. When the water level in the collection tank reaches the pump stop water level, the sewage pump stops to complete one sewage discharge. After each discharge, the impurities in the sedimentation chamber are cleaned once, which not only avoids the deposition of impurities but also saves manual and scheduled cleaning; It also prevents impurities from passing through the sewage pump, avoiding damage caused by the pump getting stuck.


AfterSalesService :
Key words:- Prefabricated pump station
More Products