Prefabricated pump station Wenshan buried fiberglass integrated rainwater prefabricated pump station
Prefabricated pump station Wenshan buried fiberglass integrated rainwater prefabricated pump station

Prefabricated pump station Wenshan buried fiberglass integrated rainwater prefabricated pump station

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

JZPPS-2-8-20/3

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZPPS-2-8-20/3

pump power:

twenty

Flow meter specifications:

one hundred and fifty

Diameter of water outlet pipe:

four hundred

Inlet pipe diameter:

seven hundred

Processing & Customization:

yes

voltage:

three hundred and eighty

power:

twenty thousand

water temperature:

0-60

Device Name:

Prefabricated pump station

Overall dimensions:

200X800

Wastewater treatment capacity:

one hundred and fifty

Specifications:

2X8m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

26,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-2-8-20/3

    pump power

    twenty

    Flow meter specifications

    one hundred and fifty

    Diameter of water outlet pipe

    four hundred

    Inlet pipe diameter

    seven hundred

    Processing & Customization

    yes

    voltage

    three hundred and eighty

    power

    twenty thousand

    water temperature

    0-60

    Device Name

    Prefabricated pump station

    Overall dimensions

    200X800

    Wastewater treatment capacity

    one hundred and fifty

    Specifications

    2X8m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

      Prefabricated pump stationThe liquid level information of the pump station is fed back to the control system by pressure sensors or floating balls, and the water pump switch is adjusted by the operating parameters set by the control system. When the liquid level reaches the system set opening water pump level, the control system will control the water pump to start, so that sewage is pumped from the pump station to the outlet of the municipal sewage pipeline; When the sewage pumping is below the set liquid level of the system, the system will control the water pump to stop running and repeat the cycle. According to different working conditions, different installation methods are adopted to ensure the long service life and efficient operation of the pump station. Under normal circumstances, we recommend using the installation method of ① fully built-in base wet well pump station. In addition, installation methods such as ② external valve wet well pump station, ③ dry wet separation pump station, and ④ pump station with maintenance room can also be used. Customers can decide which installation method to use based on the design drawings or specific on-site usage conditions. The integrated sewage lifting pump station is a turnkey pump station that lifts sewage, rainwater, drinking water, and wastewater. It is produced and assembled by the factory and transported to the site for installation.

    AfterSalesService :

    Key words:
    • Prefabricated pump station