Integrated sewage pump station and sewage lifting pump station manufacturer produce fiberglass integrated pump station
Integrated sewage pump station and sewage lifting pump station manufacturer produce fiberglass integrated pump station

Integrated sewage pump station and sewage lifting pump station manufacturer produce fiberglass integrated pump station

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

JZPPS-3-9-20/3

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZPPS-3-9-20/3

pump power:

twenty

Flow meter specifications:

one hundred and eighty

Diameter of water outlet pipe:

six hundred

Inlet pipe diameter:

eight hundred

Processing & Customization:

yes

voltage:

three hundred and eighty

power:

twenty thousand

water temperature:

0-60

Device Name:

Integrated sewage pumping station

Overall dimensions:

300X900

Wastewater treatment capacity:

one hundred and sixty

Specifications:

3*9m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

32,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-3-9-20/3

    pump power

    twenty

    Flow meter specifications

    one hundred and eighty

    Diameter of water outlet pipe

    six hundred

    Inlet pipe diameter

    eight hundred

    Processing & Customization

    yes

    voltage

    three hundred and eighty

    power

    twenty thousand

    water temperature

    0-60

    Device Name

    Integrated sewage pumping station

    Overall dimensions

    300X900

    Wastewater treatment capacity

    one hundred and sixty

    Specifications

    3*9m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Integrated sewage pumping stationCharacteristics of

      1. Short construction period: You can complete excavation, backfilling, compaction, connection, leakage testing, control system installation, trial operation, final commissioning, and all processes within two weeks.

      2. Strong anti leakage performance: The cylinder is controlled by a computer to wrap around the wellbore, with high integration in one molding process, preventing leakage and cracking.

      3. Integrated design: The components in the pump station water, as well as the overall crushing and ventilation system, are designed to be integrated as a whole.

      4. CDF analysis: Adopting fluid dynamics design, automatic cleaning, and preventing blockage.

      5. Strength analysis testing: Each product undergoes a strength analysis test before leaving the factory to ensure its safety and reliability.

      6. Intelligent control system: No need for dedicated personnel to be on duty, GPRS remote monitoring system, knowing the operation status of the pump station anytime, anywhere

      Integrated sewage lift pump station for external and internal maintenance:

      1. Personnel entering the pumping station are required to be personnel and receive safety education; At the same time as the homework personnel go down the well, at least 2 people must supervise the entire process, and the supervisors must not leave their posts without permission.

      2. Preparation before going down to the well: Ventilation work should be done at least 2 hours in advance, and the well cover and ventilation system should be opened until the operation is completed; At the same time, warning signs should be placed around the pump station before starting work to prevent pedestrians from falling into the pump pit; In addition, the safety equipment of the staff must be complete, including gas masks, gloves, safety ropes, gas detectors, etc.

      3. Precautions for underground operations, mainly to avoid safety issues such as toxic gases and power sources. During the homework period, gas detection must be conducted every half hour to ensure normal underground air. If there are any abnormalities, emergency measures must be taken; Smoking and open flames are strictly prohibited underground to avoid bringing flammable and explosive materials into the pump station. If welding equipment with open flames is required for operation, sufficient ventilation must be carried out; When in contact with rotating or electrified machinery such as crushing grids, it is necessary to ensure that the power is disconnected, and it is strictly prohibited to carry out electrified operations underground.

    AfterSalesService :

    Key words:
    • Integrated sewage pumping station