Underground fire pump station production, fire booster water supply equipment, integrated manufacturer of buried box pumps
Category:
Environmental Protection/Sewage treatment equipment/Buried sewage treatment equipment
Model:
JZFBZ-700-150-50-1
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZFBZ-700-150-50-1
purpose:
Fire water supply
Processing & Customization:
yes
Wastewater treatment capacity:
one hundred and sixty
category:
Underground fire pump station
Decontamination rate:
ninety-nine
pump power:
eighteen
Overall dimensions:
700x150x50
Flow meter specifications:
one hundred and sixty
Diameter of water outlet pipe:
four hundred
Inlet pipe diameter:
seven hundred
Specifications:
7X1.5X0.5m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze
Retail Price
30,000.00USD
重量
kg
- Product Description
-
model JZFBZ-700-150-50-1
purpose Fire water supply
Processing & Customization yes
Wastewater treatment capacity one hundred and sixty
category Underground fire pump station
Decontamination rate ninety-nine
pump power eighteen
Overall dimensions 700x150x50
Flow meter specifications one hundred and sixty
Diameter of water outlet pipe four hundred
Inlet pipe diameter seven hundred
Specifications 7X1.5X0.5m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze
Description :
Underground fire pump station Fire booster water supply equipment: 1. The supervising engineer should clarify the basis, standards, and implementation methods for on-site safety and civilized construction inspections to the construction unit and the construction unit in advance, and obtain unified opinions.
2. Reasonably determine the inspection frequency and schedule according to relevant regulations and project characteristics.
3. For safety hazards discovered during inspections, the construction unit should be promptly ordered to rectify and the implementation of rectification should be tracked. When necessary, report the situation to relevant parties to ensure timely and effective implementation of measures.
4. For construction units that have long-term serious safety hazards or fail to meet safety and civilized construction standards, in addition to informing relevant parties of the situation, they should dare to use the supervisory veto power and objectively and fairly sign record opinions in relevant archives.
Construction refers to the construction of a project according to plan. The specific construction introduction of the underground fire booster integrated pump station standard cannot be expressed clearly in words. Today, I will use a combination of pictures and text to analyze this issue for you. We are selling finished products of underground fire booster integrated pump stations, which are installed, debugged, and delivered to customers. But some customers with more delicate thoughts may ask what the construction standards for underground fire booster integrated pumping stations are.

Integrated manufacturer of underground box pumps for producing fire-fighting booster water supply equipment
1. Earthwork excavation
Confirm the excavation sequence and slope - divide and layer by layer average excavation - trimming and cleaning the bottom.
(1) Determination of slope:
The excavation slope of this project is determined according to the local soil conditions.
2. The outlet pipe, sewage pipe, inlet pipe and external pipeline of the buried fire booster integrated pump station are connected by flanges.
3. Underground fire booster integrated pump station and water testing: After the installation of the pump station is completed, water will be injected for 24 hours.
4. The buried fire booster integrated pump station will lead dual power sources to the PAE dual power control cabinet.
5. The outer side of the buried fire booster integrated pump station box is coated with epoxy coal tar roller coating, with a thickness of 2-3mm.
6. The fasteners of the buried fire booster integrated pump station are coated with two layers of epoxy zinc rich primer and two layers of epoxy glass flake surface coating.
7. Underground fire booster integrated pump station pressure test: manually start each water pump separately, test the pressure at 1.2 times the set pressure for 15 minutes, and set the pressure relief value of the safety relief valve at 1.1 times the design pressure.
8. Grounding of buried fire booster integrated pump station: All equipment must be grounded.
9. The soil covering of the buried fire booster integrated pump station is uniformly compacted layer by layer every 500mm around the pump station. The top plate is compacted using a frog or flat plate vibration compactor, and the soil covering is 1.0m deep


AfterSalesService :
Key words:- Underground fire pump station
More Products