Integrated sewage pump station, integrated sewage pump station manufacturer, prefabricated sewage lifting pump station
Integrated sewage pump station, integrated sewage pump station manufacturer, prefabricated sewage lifting pump station

Integrated sewage pump station, integrated sewage pump station manufacturer, prefabricated sewage lifting pump station

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

JZPPS-2-8-20/3

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZPPS-2-8-20/3

pump power:

twenty

Flow meter specifications:

one hundred and sixty

Diameter of water outlet pipe:

five hundred

Inlet pipe diameter:

seven hundred

Processing & Customization:

yes

voltage:

three hundred and eighty

power:

twenty thousand

water temperature:

0-60

Device Name:

Integrated sewage pumping station

Overall dimensions:

200X800

Wastewater treatment capacity:

one hundred and fifty

Specifications:

2X8m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

34,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-2-8-20/3

    pump power

    twenty

    Flow meter specifications

    one hundred and sixty

    Diameter of water outlet pipe

    five hundred

    Inlet pipe diameter

    seven hundred

    Processing & Customization

    yes

    voltage

    three hundred and eighty

    power

    twenty thousand

    water temperature

    0-60

    Device Name

    Integrated sewage pumping station

    Overall dimensions

    200X800

    Wastewater treatment capacity

    one hundred and fifty

    Specifications

    2X8m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Integrated sewage pump station manufacturer Product features:

      1. The driving shaft and driven shaft of the crushing type grille are made of 4140 (high-strength alloy steel) heat treated hexagonal steel, with a tensile tension of not less than 1000 kPa. The machine seal should be installed on the shaft sleeve to avoid direct contact with the shaft, reduce the impact of operating torque on the machine seal, and extend the service life of the machine seal. The crusher should be installed in the prefabricated pump station, and the water flow rate of each crushing type grating device should meet the sewage volume of the pump station. The bottom of the pit should be flat, and a layer of 10mm thick gravel layer should be laid on top. The concrete installation foundation can be pre constructed, directly poured at the bottom of the pit, or directly poured on the compacted layer, and the cement base plate should be horizontal. The upper surface of the base plate must be polished smooth.

      2. Due to the fact that the conveying medium contains a large amount of sand, oil, and various household impurities, especially the high concentration of chloride ions in sewage. The cutting blade material of the crushing grid machine should have high strength and hardness conditions, and the equipment material should have seawater resistance function. The entire equipment should include a crushing type grille and auxiliary grille mesh bars to prevent garbage overflow during operation at ultra-high water levels, as well as channel support frames, suspension chains, foundation bolts, power control cables from the electrical control cabinet to the junction box and from the junction box to the motor, and all necessary accessories for safe and reliable operation.

      3. The crushing type grille must be able to operate continuously under dry/wet conditions. To control future maintenance and replacement costs, it is necessary to provide a detailed explanation of the cutting blade and gasket forms used in the equipment, as well as detailed data on daily maintenance and replacement costs.

      4. The motor is directly connected to the reducer, and the reducer is lubricated with oil bath. It should be suitable for severe vibration environments and have a shock absorption capacity of 500%. The output shaft is connected to the crushing grid through a two jaw coupling. The bottom of the pit should be flat, and a layer of 10mm thick gravel layer should be laid on top. The concrete installation foundation can be pre constructed, directly poured at the bottom of the pit, or directly poured on the compacted layer, and the cement base plate should be horizontal. The upper surface of the base plate must be polished smooth.

    Integrated sewage pump station manufacturer prefabricated sewage lifting pump stationProduct Advantage Analysis:

      1. Customized on demand

      Each prefabricated pump station is designed based on the data provided by the customer to ensure that the operating conditions of the pump station meet the usage requirements.

      2. New materials

      The prefabricated pump station cylinder structure is made of fiber wrapped fiberglass (GRP), which is continuously wound and formed by computer control to ensure uniform thickness and meet design requirements, with stable and excellent quality.

      3. Accessory standards

      All accessories are prefabricated in the factory, including pressure pipelines, maintenance platforms, inlet and outlet pipes, etc. Before leaving the factory, they are tested to ensure the quality and reliability of the accessories.

      4. Highly integrated

      Prefabricated pump stations, as integrated equipment, provide complete sets of pump station cylinders, pressure pipelines, maintenance platforms, maintenance ladders, grating devices, coupling systems, ventilation devices, anti slip manhole covers, etc.

      5. The bottom of the integrated prefabricated pump station pit should be flat and should be covered with a 10mm thick gravel layer. The concrete installation foundation can be pre constructed, directly poured at the bottom of the pit, or directly poured on the compacted layer, and the cement base plate should be horizontal. The upper surface of the base plate must be polished smooth. attractive appearance

      All prefabricated pump stations are buried underground, with only maintenance holes and control boxes left on the ground. Alternatively, a landscape style management room can be selected and placed on the ground to coordinate with the surrounding environment.

      6. Engineering cycle

      Finished product supply, installation and debugging of various components are completed in the factory. The goods only need to be positioned and buried as a whole when they arrive at the site, and the installation and commissioning time required is shortened compared to traditional pump stations. The construction period is very short.

      7. Highly automated

      It can achieve remote control and management, as well as fault alarm, without the need for dedicated personnel to be on duty, greatly reducing management costs in the later stage.

      8. Cost savings

      The pump station is supplied as a complete set, and all internal installation and commissioning work is completed in the factory. Only the pump station needs to be installed as a whole on site, greatly reducing the construction period and project cost of civil engineering, and lowering the overall investment of the owner.

      9. Service life

      The material of the pump station cylinder is fiberglass, and the internal accessories are made of anti-corrosion materials such as SUS304 and hot-dip galvanizing, which do not require maintenance. The normal service life can reach more than 30 years.

      10. The bottom of the integrated prefabricated pump station pit should be flat and should be covered with a 10mm thick gravel layer. The concrete installation foundation can be pre constructed, directly poured at the bottom of the pit, or directly poured on the compacted layer, and the cement base plate should be horizontal. The upper surface of the base plate must be polished smooth. The water pump and grille are all equipped with guide rails for easy maintenance, which can be quickly removed and installed during maintenance.

    AfterSalesService :

    Key words:
    • Integrated sewage pumping station