Integrated sewage pump station, integrated sewage lifting pump station, rainwater and sewage combined lifting pump station
Category:
Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment
Model:
JZPPS-2.5-8.5-22/3
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZPPS-2.5-8.5-22/3
pump power:
twenty-two
Flow meter specifications:
one hundred and sixty
Diameter of water outlet pipe:
four hundred
Inlet pipe diameter:
seven hundred
Processing & Customization:
yes
voltage:
three hundred and eighty
power:
twenty-two thousand
water temperature:
0-60
Device Name:
Integrated sewage pumping station
Overall dimensions:
250x850
Wastewater treatment capacity:
one hundred and fifty
Specifications:
2.5x8.5m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
31,800.00USD
重量
kg
- Product Description
-
model JZPPS-2.5-8.5-22/3
pump power twenty-two
Flow meter specifications one hundred and sixty
Diameter of water outlet pipe four hundred
Inlet pipe diameter seven hundred
Processing & Customization yes
voltage three hundred and eighty
power twenty-two thousand
water temperature 0-60
Device Name Integrated sewage pumping station
Overall dimensions 250x850
Wastewater treatment capacity one hundred and fifty
Specifications 2.5x8.5m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Integrated sewage pumping stationIt is an integrated buried prefabricated pump station that is fully prefabricated in the factory according to specific customer requirements and installed before leaving the factory. The wellbore of this integrated product is produced using advanced materials, including water pumps, grilles, pipelines, valves, instruments, control equipment, and maintenance facilities, to ensure the cost-effectiveness and operational reliability of the system. Whether in the fields of urban waterlogging prevention and control or rainwater and sewage collection and treatment, Jinze Water Supply has numerous successful operational cases.

Introduction to Integrated Sewage Pumping Station: Sewage generated from daily life, construction, rainwater, industry, etc. has gradually affected our production and life. For some areas with limited conditions, sewage treatment is very difficult. Due to long-term retention, the impact on the overall environment is still significant. The emergence of Jinze Fiber Wrapped Prefabricated Pumping Station has played a favorable role in sewage treatment. This device is mainly used in environments low from the main pipeline or in some areas far away from the main pipeline. With its lifting device, sewage is automatically sent to a specific sewage treatment plant for treatment. It not only facilitates the operation process, but also greatly benefits the change of the environment. The station provides potential energy and pressure energy for water, solving the problems of drainage, water supply, and water resource allocation under non self flowing conditions. Power source. As the current mainstream pumping station, traditional concrete pumping stations are applied to drainage systems. However, over time, traditional pumping stations have also exposed some insurmountable drawbacks in long-term operation, such as easy corrosion of pool walls, sedimentation of impurities in pump pits, and low integration difficulty, making it difficult to achieve effective management and monitoring. In order to address this challenge, experts from Jinze Water Supply have conducted extensive testing on the extension of fiberglass storage tank products and successfully developed Jinze Integrated Sewage Prefabricated Pumping Station.

Advantages of integrated sewage pump station: Integrated prefabricated pump station is an ideal substitute for traditional sewage pump station. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. In the construction process of the pump station, it is also necessary to cooperate with contractors of various processes. These unnecessary processes will consume a lot of energy from planners, and the engineering quality of each contractor will also vary. With JZWS, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, it can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs.

AfterSalesService :
Key words:- Integrated sewage pumping station
More Products