Prefabricated pump station, fiberglass integrated prefabricated pump station, sewage lifting integrated prefabricated pump station
Category:
Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment
Model:
JZPPS-3-9.5-22/3
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZPPS-3-9.5-22/3
pump power:
twenty-two
Flow meter specifications:
one hundred and eighty
Diameter of water outlet pipe:
six hundred
Inlet pipe diameter:
eight hundred
Processing & Customization:
yes
voltage:
three hundred and eighty
power:
twenty-two thousand
water temperature:
0-60
Device Name:
Prefabricated pump station
Overall dimensions:
300X950
Wastewater treatment capacity:
one hundred and sixty
Specifications:
3*9.5m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
28,000.00USD
重量
kg
- Product Description
-
model JZPPS-3-9.5-22/3
pump power twenty-two
Flow meter specifications one hundred and eighty
Diameter of water outlet pipe six hundred
Inlet pipe diameter eight hundred
Processing & Customization yes
voltage three hundred and eighty
power twenty-two thousand
water temperature 0-60
Device Name Prefabricated pump station
Overall dimensions 300X950
Wastewater treatment capacity one hundred and sixty
Specifications 3*9.5m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Prefabricated pump stationIt is an ideal substitute for traditional sewage pumping stations. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. In the construction process of the pump station, it is also necessary to cooperate with contractors of various processes. These unnecessary processes will consume a lot of energy from planners, and the engineering quality of each contractor will also vary. With the integrated prefabricated pump station, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, it can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs.

Advantages of integrated prefabricated pump station sewage lifting pump station: Generally, people will use concrete water tanks, which requires a long construction time and a large amount of manpower and financial resources. The process is very complex and cumbersome. Using an integrated prefabricated pump station will save 80% of the cost resources. Moreover, the integrated prefabricated pump station is buried underground, occupies a small area, and can be used for greening on the surface without affecting the appearance. Installation is also relatively easy, and the device has strong corrosion resistance, which can effectively improve its service life during application. It basically does not require daily maintenance and has a low failure rate.


AfterSalesService :
Key words:- Prefabricated pump station
More Products