Integrated sewage pump station, multi-purpose integrated pump station, rainwater and sewage discharge integrated pump station
Category:
Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment
Model:
JZPPS-2.5-8.5-22/3
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZPPS-2.5-8.5-22/3
pump power:
twenty-two
Flow meter specifications:
one hundred and eighty
Diameter of water outlet pipe:
five hundred
Inlet pipe diameter:
seven hundred
Processing & Customization:
yes
voltage:
three hundred and eighty
power:
twenty-two thousand
water temperature:
0-60
Device Name:
Integrated sewage pumping station
Overall dimensions:
250x850
Wastewater treatment capacity:
one hundred and fifty
Specifications:
2.5x8.5m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
32,000.00USD
重量
kg
- Product Description
-
model JZPPS-2.5-8.5-22/3
pump power twenty-two
Flow meter specifications one hundred and eighty
Diameter of water outlet pipe five hundred
Inlet pipe diameter seven hundred
Processing & Customization yes
voltage three hundred and eighty
power twenty-two thousand
water temperature 0-60
Device Name Integrated sewage pumping station
Overall dimensions 250x850
Wastewater treatment capacity one hundred and fifty
Specifications 2.5x8.5m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Integrated sewage pumping stationWorking principle: The liquid level information of the pump station is fed back to the control system by pressure sensors or floating balls, and then the water pump switch is adjusted by the operating parameters set by the control system. When the liquid level reaches the system set opening water pump level, the control system will control the water pump to start, so that sewage is pumped from the pump station to the outlet of the municipal sewage pipeline; When the sewage pumping is below the set liquid level of the system, the system will control the water pump to stop. This cycle repeats to ensure the smooth operation of the integrated pump station.

Integrated sewage pumping stationIt is an ideal substitute for traditional sewage pumping stations. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. With the integrated pump station, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, integrated pumping stations can solve a series of problems such as leakage and corrosion, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs in traditional pumping stations.



AfterSalesService :
Key words:- Integrated sewage pumping station