Integrated sewage pump station, sewage lifting pump station, railway rainwater discharge integrated pump station
Integrated sewage pump station, sewage lifting pump station, railway rainwater discharge integrated pump station

Integrated sewage pump station, sewage lifting pump station, railway rainwater discharge integrated pump station

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

JZPPS-3.8-10-30/3

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZPPS-3.8-10-30/3

pump power:

thirty

Flow meter specifications:

two hundred

Diameter of water outlet pipe:

eight hundred

Inlet pipe diameter:

one thousand

Processing & Customization:

yes

voltage:

three hundred and eighty

power:

thirty thousand

water temperature:

0-60

Device Name:

Integrated sewage pumping station

Overall dimensions:

380*1000

Wastewater treatment capacity:

two hundred

Specifications:

3.8X10m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

32,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-3.8-10-30/3

    pump power

    thirty

    Flow meter specifications

    two hundred

    Diameter of water outlet pipe

    eight hundred

    Inlet pipe diameter

    one thousand

    Processing & Customization

    yes

    voltage

    three hundred and eighty

    power

    thirty thousand

    water temperature

    0-60

    Device Name

    Integrated sewage pumping station

    Overall dimensions

    380*1000

    Wastewater treatment capacity

    two hundred

    Specifications

    3.8X10m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Integrated sewage pumping stationApplication scope: 1. Collection and transportation of sewage in residential or rural communities. 2. Collection and transportation of sewage from urban sewage treatment plants. 3. Collection and transportation of rainwater in low-lying areas of urban areas. 4. Construction and renovation of municipal sewage pipelines. 5. Renovation and expansion of old pumping stations. 6. Water circulation in lakes. The integrated pump station provides complete sets of water pumps, pipelines, valves, instruments, control equipment, and other accessories required by users, and they are installed and tested before leaving the factory. Integrated pump station is a new type of integrated pump station equipment that is easy to use, reliable in quality, requires less civil engineering work, and has lower costs. Its significant feature is volume optimization.

    Integrated sewage pumping stationIt is an ideal substitute for traditional sewage pumping stations. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of integrated pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. In the construction process of integrated pumping stations, it is also necessary to cooperate with contractors of various processes. These unnecessary processes will consume a lot of energy from planners, and the engineering quality of each contractor will also vary. With the integrated pump station, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of pump station installation time, with a time-saving rate of 80%. More importantly, it can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs.

    AfterSalesService :

    Key words:
    • Integrated sewage pumping station