Application of prefabricated pump station integrated prefabricated pump station sponge city
Category:
Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment
Model:
JZPPS-3-9-20/3
Brand:
Yancheng Jinze Water Supply Equipment Co., Ltd
model:
JZPPS-3-9-20/3
pump power:
twenty
Flow meter specifications:
one hundred and eighty
Diameter of water outlet pipe:
six hundred
Inlet pipe diameter:
eight hundred and fifty
Processing & Customization:
yes
voltage:
three hundred and eighty
power:
twenty thousand
water temperature:
0-60
Device Name:
Prefabricated pump station
Overall dimensions:
300X900
Wastewater treatment capacity:
one hundred and fifty
Specifications:
3*9m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
36,000.00USD
重量
kg
- Product Description
-
model JZPPS-3-9-20/3
pump power twenty
Flow meter specifications one hundred and eighty
Diameter of water outlet pipe six hundred
Inlet pipe diameter eight hundred and fifty
Processing & Customization yes
voltage three hundred and eighty
power twenty thousand
water temperature 0-60
Device Name Prefabricated pump station
Overall dimensions 300X900
Wastewater treatment capacity one hundred and fifty
Specifications 3*9m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Prefabricated pump stationFocusing on technological breakthroughs and product development has been the driving force behind Yancheng Jinze's ability to stand among the strong for many years. By introducing design, development, and enterprise management models with international standards, our products have tremendous international competitiveness. Compared with traditional open sewage pumping stations, buried prefabricated pumping stations operate in a fully enclosed manner, produce no odors, and do not pollute the surrounding environment. Compared with traditional open sewage lift pump stations, there is no need for personnel to clean and transport garbage. The garbage in the sewage is thoroughly crushed and pumped out, greatly saving the operation and management costs of the pump station. The construction period is short, and all components of TYB underground prefabricated pump station are prefabricated and assembled in the factory. Its construction period is one tenth of that of traditional open sewage lift pump station, usually completed in ten days. Due to the fact that the underground prefabricated pump station is made of high-performance integrated materials, there will be no cracks or sewage leakage, which will pollute the groundwater source. One control and two electrical control boxes, one in use and one backup, automatic switching and mutual backup, fully automatic control, equipment operation without personnel supervision, automatic start and stop, liquid level control system service life of over 200000 times. Jiangsu has launched a special law enforcement action against illegal activities such as discharging sewage into urban rainwater pipes and dumping garbage, mainly involving sewage lifting, rainwater collection outlets, discharge of sewage from rainwater pipes, dumping of garbage, and other pollutants and waste that affect river channels, pipeline networks, and urban environmental sanitation. When it is necessary to lift sewage from one point to a higher elevation, a sewage lifting pump station needs to be set up. Today, integrated prefabricated pump stations are not often built with factory assembled overall equipment, only with partially factory assembled units or a series of units to construct lifting stations.


AfterSalesService :
Key words:- Prefabricated pump station
More Products