Underground fire pump station, assembled buried box pump, integrated fire water tank pump station
Underground fire pump station, assembled buried box pump, integrated fire water tank pump station

Underground fire pump station, assembled buried box pump, integrated fire water tank pump station

Category:

Environmental Protection/Sewage treatment equipment/Buried sewage treatment equipment

Model:

JZFBZ-700-150-50-1

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZFBZ-700-150-50-1

purpose:

Fire water supply

Processing & Customization:

yes

Wastewater treatment capacity:

one hundred and eighty

category:

Underground fire pump station

Decontamination rate:

ninety-nine

pump power:

eighteen

Overall dimensions:

700x150x50

Flow meter specifications:

one hundred and eighty

Diameter of water outlet pipe:

four hundred

Inlet pipe diameter:

seven hundred and fifty

Specifications:

7X1.5X0.5m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze

Retail Price

34,000.00USD


重量

kg

  • Product Description
  • model

    JZFBZ-700-150-50-1

    purpose

    Fire water supply

    Processing & Customization

    yes

    Wastewater treatment capacity

    one hundred and eighty

    category

    Underground fire pump station

    Decontamination rate

    ninety-nine

    pump power

    eighteen

    Overall dimensions

    700x150x50

    Flow meter specifications

    one hundred and eighty

    Diameter of water outlet pipe

    four hundred

    Inlet pipe diameter

    seven hundred and fifty

    Specifications

    7X1.5X0.5m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze

    Description :

    Underground fire pump stationPrefabricated water tankBuried underground is beneficial for saving space on the ground, allowing for normal planting of greenery without affecting the environment. The buried assembled water tank is made of composite plates of stainless steel and galvanized steel, with strong strength, clean and hygienic. The fire pump is placed inside the water tank, without the need for a concrete pump room. When a buried prefabricated water tank is buried underground, some people may ask, does the water tank have to withstand water pressure inside and soil pressure outside, so that the water tank is not easily deformed? In fact, there are tension bars and standing columns inside the water tank that are reinforced and fixed at intervals of one meter, so there is no need to worry. The exterior of the water tank will also be coated with asphalt for corrosion prevention.

    Prefabricated water tank for buried fire pump stationIt is our company's flagship product, with thoughtful after-sales service, complete qualifications, superior quality, and reasonable prices. Welcome to call for consultation. Characteristics of buried prefabricated water tanks: Developing cost high-tech products using new materials, technologies, and processes. It integrates a water tank and a pump room, with a novel concept and reasonable design, and has been used by thousands of users across the country. The buried assembled water tank solves the problem of occupying a large amount of land for the original water tank. Buried underground, it can be used as a parking lot or greening on the ground. Compared with traditional buried water tank products on the market, this product has several advantages: firstly, it has good anti floating effect. Because the bottom plate is connected to the box body during design, the weight of the box body offsets the buoyancy of groundwater. Therefore, not a single of the over 100 buried prefabricated water tanks we produce each year has encountered any problems due to buoyancy. Secondly, the system is well maintained, and all internal components such as reinforcement, pump stations, pipelines, and sprinklers are running smoothly without any damage; Thirdly, the structure is more sturdy. The planting of grass and trees, as well as the parking of cars, were not affected in any way. Fourthly, it saves costs. Labor costs are reduced by 25%, material production is reduced by 21%, and project duration is shortened by 18%.

    AfterSalesService :

    Key words:
    • Underground fire pump station