Prefabricated pump station fiberglass integrated prefabricated pump station sewage lifting device
Prefabricated pump station fiberglass integrated prefabricated pump station sewage lifting device

Prefabricated pump station fiberglass integrated prefabricated pump station sewage lifting device

Category:

Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment

Model:

JZPPS-2.5-8.5-22/3

Brand:

Yancheng Jinze Water Supply Equipment Co., Ltd

model:

JZPPS-2.5-8.5-22/3

pump power:

twenty-two

Flow meter specifications:

one hundred and fifty

Diameter of water outlet pipe:

five hundred

Inlet pipe diameter:

seven hundred

Processing & Customization:

yes

voltage:

three hundred and eighty

power:

twenty-two thousand

water temperature:

0-60

Device Name:

Prefabricated pump station

Overall dimensions:

250x850

Wastewater treatment capacity:

one hundred and fifty

Specifications:

2.5x8.5m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

26,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-2.5-8.5-22/3

    pump power

    twenty-two

    Flow meter specifications

    one hundred and fifty

    Diameter of water outlet pipe

    five hundred

    Inlet pipe diameter

    seven hundred

    Processing & Customization

    yes

    voltage

    three hundred and eighty

    power

    twenty-two thousand

    water temperature

    0-60

    Device Name

    Prefabricated pump station

    Overall dimensions

    250x850

    Wastewater treatment capacity

    one hundred and fifty

    Specifications

    2.5x8.5m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

      After the production of the prefabricated pump station sewage lifting device is completed and transported to the construction site, there are many precautions that cannot be ignored, which need to be treated carefully and without any carelessness. So what are the precautions for installing an integrated prefabricated pump station? 1. Acceptance inspection of integrated prefabricated pump station tank: Check whether the fiberglass integrated prefabricated pump station cylinder has any transportation losses, whether the shipping list complies with the ordering agreement, the position and size of accessories, check and tighten all bolts to prevent loosening during transportation, and inspect other equipment. 2. Transportation and lifting of integrated prefabricated pump stations, intelligent integrated prefabricated pump station tank transportation must be placed in a horizontal position and must be fixed on the tank bracket. The loading and unloading process must be carried out together with the transport pallet. Before installation and lifting to a vertical position, the tank bracket and connecting accessories must be removed. In the construction area, customers must provide their own lifting facilities. The transportation and lifting of the tank should strictly follow the following steps. a) Use lifting straps and fiberglass integrated prefabricated pump station tank transport brackets to horizontally move the pump station to the ground. Attention, it is prohibited to use lifting lugs or steel wire ropes or chains to provide the tank body at this time. b) Lift the tank from a horizontal position to a vertical position using a sling. c) When lifting vertically, use lifting ears and distribute the weight evenly across all lifting ears.

      If the sewage lifting device of the integrated prefabricated pump station needs to be installed, the first step is to check whether the foundation of the integrated prefabricated pump station has the installation conditions. The integrated prefabricated pump station has many advantages, one of which is its long service life. The cylinder is made of a new material fiber glass steel, which has the advantages of pressure resistance, corrosion resistance, and leakage prevention. It can be buried deep underground for 50 years without deformation.

    AfterSalesService :

    Key words:
    • Prefabricated pump station