Case Study of Guizhou Integrated Prefabricated Pump Station Pipe Network Extension Project
Category:
Environmental Protection/Sewage treatment equipment/Integrated sewage treatment equipment
Model:
JZPPS-2-8-20/3
Brand:
Kanazawa
model:
JZPPS-2-8-20/3
pump power:
twenty
Flow meter specifications:
one hundred and twenty
Diameter of water outlet pipe:
four hundred
Inlet pipe diameter:
seven hundred
Processing & Customization:
yes
voltage:
three hundred and eighty
power:
twenty thousand
water temperature:
0-60
Device Name:
Prefabricated pump station
Overall dimensions:
200X800
Wastewater treatment capacity:
one hundred and twenty
Specifications:
2X8m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
28,000.00USD
重量
kg
- Product Description
-
model JZPPS-2-8-20/3
pump power twenty
Flow meter specifications one hundred and twenty
Diameter of water outlet pipe four hundred
Inlet pipe diameter seven hundred
Processing & Customization yes
voltage three hundred and eighty
power twenty thousand
water temperature 0-60
Device Name Prefabricated pump station
Overall dimensions 200X800
Wastewater treatment capacity one hundred and twenty
Specifications 2X8m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Prefabricated pump stationThe integrated Miao Ridge in Guizhou is the watershed of the Yangtze River and the Pearl River basins. To the north is the Yangtze River basin, with a drainage area of 115747 square kilometers, accounting for 66.1% of the land area of the province. The main rivers are Wujiang River, Chishui River, Qingshui River, Hongzhou River, Wuyang River, Jinjiang River, Songtao River, Songkan River, Niulan River, Hengjiang River, etc. To the south of Miaoling is the the Pearl River Basin, with a drainage area of 60420 square kilometers, accounting for 35.0 percent of the provincial land area. The main rivers are Nanpan River, Beipan River, Hongshui River, Duliu River, Dagou River, etc. The level of requirements for Guizhou's integrated prefabricated pump station is actually the high degree of trust that customers have in the manufacturer of the integrated pump station. If the manufacturer is recognized, communication for product production and manufacturing will be relatively simple. If not recognized, there will naturally be multiple word confirmations. So, ultimately, the customer's request is a requirement for smooth cooperation between both parties. Guizhou integrated prefabricated pump station Guizhou River is located in the crisscross area of the upper reaches of the Yangtze River and the Pearl River. There are 69 counties in the Yangtze River Shelter Forest Reserve, which is an important ecological barrier in the upper reaches of the Yangtze River and the Pearl River. The water system in the province is divided into three directions along the terrain: west, central, north, east, and south.
Case Study of Guizhou Integrated Prefabricated Pump Station Pipeline Extension Project
Guizhou Huishui County, Guizhou Construction site of School of Business, Finance and Economics University, Huishui County, Qiannan Buyi and Miao Autonomous Prefecture, Guizhou Province Dimensions of Guizhou Integrated Prefabricated Pump Station Φ2000*5000
Huairen City, Guizhou Province Extension Project of Pipeline Network in Houshan Township, Huairen City, Guizhou Province Dimensions of Guizhou Integrated Prefabricated Pump Station Φ2000x4500



AfterSalesService :
Key words:- Prefabricated pump station
More Products