Yun'an fast lifting door physical factory construction period guarantee
Category:
building materials/door/Rolling shutter door
Model:
YXS-KSM01
Brand:
Yongxingsheng
Retail Price
5,800.00USD
重量
kg
- Product Description
-
Description :
Yun'an fast lifting door physical factory construction period guarantee
Quick door installation steps
The fast door is composed of multiple components, including a motor that provides power performance, an electrical box as a control system, door curtains, transparent windows, and so on. The quality of the quick door is not only reflected in the quality of each component itself, but also in its installation. High installation quality, fast door operation can last longer, be smoother, and avoid many unnecessary troubles during use.
Installation personnel must be familiar with the installation drawings of the quick door before installation, check whether the wiring of the quick door is in place, and make other installation preparations, including the required components, tools, etc.
Before installation, it is also necessary to check whether the size of the door matches the size of the opening; Is the quantity of guide rail brackets correct; Whether the positions of the pre embedded parts at the entrance and the embedded parts of the bracket are correct, etc.
The process flow can be roughly divided into: hole treatment, wire drawing, fixed drum transmission device, no-load test run, curtain board installation, guide rail installation, test run, and cleaning.
Hole treatment: Verify whether the hole size matches the product size. Generally, the width and height of the hole should not exceed 5m, and verify the position and quantity of embedded parts.
Bullet line: Measure the elevation of the hole, and mark the vertical lines of the two guide rails and the centerline of the drum.
Fixed drum transmission device: Weld the pad onto the pre embedded iron plate, fix the left and right brackets of the drum with screws, install the drum, the drum should rotate flexibly after installation, install the reducer and transmission system, and install the electrical control system.
No load test drive: After powering on, check whether the motor and reducer are working properly, and whether the direction of rotation of the drum is correct.
Curtain board installation: Assemble the curtain board and then install it on the drum.
Installation of guide rails: Weld the guide rails on both sides and above to the embedded parts of the wall according to the specified position on the drawing, and weld them together. Each guide rail should be on the same vertical plane.
Test run: First, manually run the test run. Use the motor to open and close several times, adjust until there is no jamming, blockage, or abnormal noise, and the opening and closing speed meets the requirements. All debugging is completed, and the protective cover is installed.
Cleaning: Painting or tiling the decorative surface layer of the guide rail wall, cleaning the site.Quick door installation precautions
When the wall opening is made of concrete, pre embedded parts should be buried inside the opening and then welded to the guide rail and bearing frame for connection; When the wall opening is made of brick masonry, drilling holes can be used to embed expansion anchor bolts and connect them with guide rails and bearing frames. When installing the guide rail, it should be straightened and lifted first. The size of the groove should be accurate, consistent up and down, and the corresponding groove should be in the same plane. Then, the connecting piece should be welded firmly to the embedded part in the hole. When installing the drum, the size should be determined first, and the drum shaft should be kept in a horizontal position. The distance between the drum shaft and the guide rail should be consistent at both ends. After temporary fixation, inspection should be carried out And make necessary adjustments and corrections, and then weld it firmly with the embedded parts of the bracket after it is confirmed to be correct. Lock installation. There are two installation positions for locks. The lock for lightweight rolling shutter doors and windows should be installed on the seat plate, and the lock for doors can also be installed at a distance of 1 meter from the ground.The superior performance of fast rolling shutter doors includes strong sealing, no dust accumulation, high stability, easy cleaning, compliance with GMP requirements, clean environment (1000 to 100000 levels), and is commonly used in modern industrial plants for pharmaceutical, food, electronics, chemical, cigarette, printing, textile, supermarket, precision machinery, logistics and warehousing, as well as area isolation in clean industrial plants. It has insulation, dust prevention, noise reduction, and odor isolation properties. Energy saving, high-speed automatic opening and closing.



AfterSalesService :
Key words:- Yun'an Quick Lift Door
More Products