100 ton heavy-duty rail flatbed manufacturer's quotation for industrial large item handling equipment flatbed truck
100 ton heavy-duty rail flatbed manufacturer's quotation for industrial large item handling equipment flatbed truck

100 ton heavy-duty rail flatbed manufacturer's quotation for industrial large item handling equipment flatbed truck

Category:

auto parts/Other automotive and motorcycle classifications/Flat transport vehicle

Model:

KPJ-100T

Brand:

one hundred percent

Retail Price

63,700.00USD


重量

kg

  • Product Description
  • Description :

      Regarding the product

      Cable drum power supplyHeavy duty rail flatcarThe AC 380V cable is powered by the cable winding device on the flat car, which is placed below the track flat car. The power supply is directly controlled by the AC control system to start, stop, move forward, and move backward of the motor. The operating system is controlled by a low-voltage 36V power supply, and a hydraulic lifting system can be installed on the flatbed, which is suitable for harsh environments, high temperature environments, explosion-proof environments, and other occasions.

      Regarding Selection

      The cable drum powered heavy-duty track flatcar is an electric flatcar that can be used for short distances within 20m~100m. The cable drum can move forward and backward by retracting the cable of the supply drum, and the electrical part of the transport vehicle is powered by the cable to achieve movement. This vehicle does not have a power limit and can operate continuously 24 hours a day. And the price is low. If the distance is less than 20m, a drag chain cable can be used for power supply. Chain cable flatbed trucks have low cost, simple structure, and efficient operation.

      Regarding after-sales service

      In case of technical and quality issues during the use of heavy-duty rail flatcars, a response shall be made within 2 hours upon receiving notification from the user, and personnel shall be dispatched to the site within 48 hours to serve Party A. In the process of handling, if any parts are replaced, the quality assurance period of the parts shall be extended from the date of replacement, and Party B shall bear all the costs of replacing the parts. When major components are replaced or repaired, Party B shall correspondingly extend the quality assurance period of the entire equipment.

    AfterSalesService :

    Key words:
    • Heavy duty rail flatcar