Tangshan buried anti floating composite board fire water tank
Tangshan buried anti floating composite board fire water tank

Tangshan buried anti floating composite board fire water tank

Category:

Security/Firefighting equipment/Fire pump

Model:

JZ-DM-03

Brand:

Kanazawa

model:

JZ-DM-03

Occasions for use:

Engineering fire pump

purpose:

voltage stabilization

Power source form:

electric motor

Auxiliary features:

Ordinary fire pump/pump set

Export pressure type:

low pressure

Processing & Customization:

yes

Export pressure value:

three hundred

rated flow:

twenty

shaft power:

two hundred and thirty-three

Diameter of suction port:

three hundred

Discharge outlet diameter:

two hundred and fifty

Operating Temperature:

thirty

Place of Origin:

Yancheng, Jiangsu

Is it imported:

No

Item Number:

DM-305

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

18,000.00USD


重量

kg

  • Product Description
  • model

    JZ-DM-03

    Occasions for use

    Engineering fire pump

    purpose

    voltage stabilization

    Power source form

    electric motor

    Auxiliary features

    Ordinary fire pump/pump set

    Export pressure type

    low pressure

    Processing & Customization

    yes

    Export pressure value

    three hundred

    rated flow

    twenty

    shaft power

    two hundred and thirty-three

    Diameter of suction port

    three hundred

    Discharge outlet diameter

    two hundred and fifty

    Operating Temperature

    thirty

    Place of Origin

    Yancheng, Jiangsu

    Is it imported

    No

    Item Number

    DM-305

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

      Tangshan buried anti floating composite board fire water tank

      1、 The buried water tank module is made of hot-dip galvanized steel plate and stainless steel plate, which are pressed and composite formed by equipment to achieve a tight fit, thus meeting the requirements of steel plate material strength and stainless steel corrosion resistance.

      2、 After compression molding, punching molding is carried out through equipment to meet the assembly requirements of standard modules.

      3、 On site assembly, the foundation channel steel is treated with national standard hot-dip treatment, and each beam is combined with a spacing of 1 meter, and so on.

      4、 Assemble according to the requirements of the atlas, using hot-dip galvanized screws and water-resistant adhesive strips. After the water tank is assembled and formed, install the tie bars and top columns. Hot dipped zinc is used for tensioning, with a horizontal and vertical cross installation every 1 meter

      Install. The top pillar is sealed with 4 hot-dip galvanized pipes evenly distributed per square meter.

      5、 According to the installation of the pump room and the screws on the outside of the pump room, the pump room is stabilized with I-beams. After installation, it is checked and accepted to ensure that there are no omissions in the fastening.

      6、 Clean the remaining accessories in the water tank.

      7、 Cover the soil and prepare the site properly.

    AfterSalesService :

    Key words:
    • Anti floating composite board fire water tank