Tangshan buried anti floating composite board fire water tank
Category:
Security/Firefighting equipment/Fire pump
Model:
JZ-DM-03
Brand:
Kanazawa
model:
JZ-DM-03
Occasions for use:
Engineering fire pump
purpose:
voltage stabilization
Power source form:
electric motor
Auxiliary features:
Ordinary fire pump/pump set
Export pressure type:
low pressure
Processing & Customization:
yes
Export pressure value:
three hundred
rated flow:
twenty
shaft power:
two hundred and thirty-three
Diameter of suction port:
three hundred
Discharge outlet diameter:
two hundred and fifty
Operating Temperature:
thirty
Place of Origin:
Yancheng, Jiangsu
Is it imported:
No
Item Number:
DM-305
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
18,000.00USD
重量
kg
- Product Description
-
model JZ-DM-03
Occasions for use Engineering fire pump
purpose voltage stabilization
Power source form electric motor
Auxiliary features Ordinary fire pump/pump set
Export pressure type low pressure
Processing & Customization yes
Export pressure value three hundred
rated flow twenty
shaft power two hundred and thirty-three
Diameter of suction port three hundred
Discharge outlet diameter two hundred and fifty
Operating Temperature thirty
Place of Origin Yancheng, Jiangsu
Is it imported No
Item Number DM-305
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :

Tangshan buried anti floating composite board fire water tank
1、 The buried water tank module is made of hot-dip galvanized steel plate and stainless steel plate, which are pressed and composite formed by equipment to achieve a tight fit, thus meeting the requirements of steel plate material strength and stainless steel corrosion resistance.
2、 After compression molding, punching molding is carried out through equipment to meet the assembly requirements of standard modules.
3、 On site assembly, the foundation channel steel is treated with national standard hot-dip treatment, and each beam is combined with a spacing of 1 meter, and so on.
4、 Assemble according to the requirements of the atlas, using hot-dip galvanized screws and water-resistant adhesive strips. After the water tank is assembled and formed, install the tie bars and top columns. Hot dipped zinc is used for tensioning, with a horizontal and vertical cross installation every 1 meter
Install. The top pillar is sealed with 4 hot-dip galvanized pipes evenly distributed per square meter.
5、 According to the installation of the pump room and the screws on the outside of the pump room, the pump room is stabilized with I-beams. After installation, it is checked and accepted to ensure that there are no omissions in the fastening.
6、 Clean the remaining accessories in the water tank.
7、 Cover the soil and prepare the site properly.



AfterSalesService :
Key words:- Anti floating composite board fire water tank
More Products