Integrated urban living water supply secondary booster pump station with above ground box pump
Category:
Security/Firefighting equipment/Fire water supply equipment
Model:
JZ-85/30-55/30-XBF
Brand:
Kanazawa
brand:
Kanazawa
model:
JZ-85/30-55/30-XBF
type:
Integrated ground tank pump
material:
Prefabricated composite panel
Specifications:
12*3*3
Scope of Application:
Fire water supply
Processing & Customization:
yes
Is it imported:
No
Retail Price
36,800.00USD
重量
kg
- Product Description
-
brand Kanazawa
model JZ-85/30-55/30-XBF
type Integrated ground tank pump
material Prefabricated composite panel
Specifications 12*3*3
Scope of Application Fire water supply
Processing & Customization yes
Is it imported No
Description :
Integrated large above ground box pumpHighlight introduction:
1. Stainless steel welded water tank - templates, steel structure skeleton, and various accessories are all connected by hot-dip galvanized bolts, thus avoiding the disadvantages of difficult anti-corrosion treatment and easy rusting after welding;
2. Stainless steel welded water tank has a long service life - all load-bearing parts are made of hot-dip galvanized and SUS304-2B stainless steel materials
3. Short installation cycle - the installation of the water tank should not exceed 30-50 days;
4. No leakage - EPDM (ethylene propylene diene monomer) rubber sealing material is used for the gap between templates;
5. Competitive price - comparable to the cost of reinforced concrete water tanks, even saving 30%
6. Large specifications - can assemble water tanks (pools) of 1-20000m3 or even infinite size according to user needs.
7. Good hygiene effect - because the inner side of the pool body is made of food grade SUS304-2B stainless steel material;
8. High strength - The product structure design is designed by steel structure engineers from the design institute, and the top pressure and lateral pressure are calculated at 100kN/㎡ and without water; The top pressure and lateral pressure are transmitted to the box body and then to the steel structure skeleton inside the box body.
9. Energy saving and environmental protection - this product can be reused and regenerated, fully meeting the current national environmental protection standards and regulations;
10. Post retail service - The quality of raw materials for this product is strictly inspected according to national standards, and installation is strictly carried out according to enterprise standards, so there is no need for after-sales service.
11. Convenient - can be drilled on site according to the construction unit, and the connecting pipe adopts non welded connection;
Integrated large above ground box pumpWelding achieves the purpose of joining through the following three methods:
1. Fusion welding - Heating the workpiece to be joined to locally melt and form a molten pool. After the molten pool cools and solidifies, it is joined. If necessary, a filler material can be added to assist. It is suitable for welding various metals and alloys without pressure.
2. Pressure welding - The welding process must apply pressure to the workpiece, which belongs to the processing of various metal materials and some metal materials.
3. Brazing - using a metal material with a lower melting point than the base metal as the brazing material, wetting the base metal with liquid brazing material, filling the joint gap, and diffusing with the base metal to achieve a connected welded part. Suitable for welding and processing of various materials, as well as welding and processing of different metals or dissimilar materials.




AfterSalesService :
Key words:- Integrated ground tank pump
More Products