Integrated rainwater pump station Tianjin integrated rainwater pump station shipping and transportation fee
Integrated rainwater pump station Tianjin integrated rainwater pump station shipping and transportation fee

Integrated rainwater pump station Tianjin integrated rainwater pump station shipping and transportation fee

Category:

Environmental Protection/Sewage treatment equipment/Sewage lift

Model:

JZPPS-3.6-7.5-7.5/2

Brand:

Kanazawa

model:

JZPPS-3.6-7.5-7.5/2

Discharge caliber:

four hundred

Inhalation caliber:

two hundred

head:

thirty

Overall dimensions:

360*750

Processing & Customization:

yes

Specifications:

3.6*7.5m

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

26,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-3.6-7.5-7.5/2

    Discharge caliber

    four hundred

    Inhalation caliber

    two hundred

    head

    thirty

    Overall dimensions

    360*750

    Processing & Customization

    yes

    Specifications

    3.6*7.5m

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

      The integrated rainwater pump station has obtained a patented pump pit design. Compared with the old-fashioned pump pit design, in order to finalize the design of the pump pit, we conducted a large number of experiments and studied and analyzed various parameters. Before finalizing the design of the self-cleaning pump pit, we also conducted calculations on many factors, such as the distance between the ground and the distance between two adjacent pumps. The design life of the integrated rainwater pump station is 50 years, and the flat pump pit ground is prone to solid material accumulation. The pump pit design has an integrated discharge connection. The slope structure can ensure a high flow velocity, which in turn generates vortices and resuspends solids, greatly improving the transport capacity of solids, with only a small amount of residual solids accumulating near the discharge connection.

    AfterSalesService :

    Key words:
    • Integrated rainwater pump station