Integrated rainwater pump station with a diameter of 3.8m, manufacturer of integrated rainwater pump station
Category:
Environmental Protection/Sewage treatment equipment/Sewage lift
Model:
JZPPS-3.8-8.0-11/2
Brand:
Kanazawa
model:
JZPPS-3.8-8.0-11/2
Discharge caliber:
four hundred
Inhalation caliber:
three hundred
head:
thirty
Overall dimensions:
380*800
Processing & Customization:
yes
Specifications:
3.8*8.0m
Is it a cross-border source of goods:
No
manufacturer:
Yancheng Jinze Water Supply Equipment Co., Ltd
Retail Price
26,000.00USD
重量
kg
- Product Description
-
model JZPPS-3.8-8.0-11/2
Discharge caliber four hundred
Inhalation caliber three hundred
head thirty
Overall dimensions 380*800
Processing & Customization yes
Specifications 3.8*8.0m
Is it a cross-border source of goods No
manufacturer Yancheng Jinze Water Supply Equipment Co., Ltd
Description :
Integrated rainwater pump station The process characteristics and advantages of the integrated rainwater pump station are applicable to the construction of urban rainwater and sewage discharge or integrated rainwater pump stations. Especially suitable for the construction of pumping stations in narrow areas of public buildings such as residential buildings, office buildings, hotels, restaurants, schools, hospitals, etc. The process principle is that the integrated rainwater pump station cylinder is made of high-strength fiberglass reinforced plastic prefabricated cylinder, and various equipment components are integrated into this movable prefabricated cylinder. The prefabricated cylinder of the integrated rainwater pump station is vertically buried underground. Adopting an intelligent fully automatic remote control system, the water discharge is efficiently and automatically adjusted according to the storage capacity. The excavation of the pump pit must be carried out according to the design drawings, and an excavation plan must be formulated. During excavation, close attention should be paid to the safety of the foundation pit. The bottom of the pump pit must be dry and free of water. If there is any, appropriate precipitation measures must be taken. The integrated rainwater pump station adopts appropriate foundation pit maintenance methods to avoid pump pit collapse. The bottom of the pit should be excavated flat. If necessary, a layer of stone free gravel should be laid and compacted with a compactor to achieve a compaction degree of 90% according to the compaction test results. After the excavation of the pump pit is completed, it is necessary to confirm that the on-site conditions for the inlet and outlet water pipes, connecting pipes, and cables of the pump station are met before installing the pump station.

AfterSalesService :
Key words:- Integrated rainwater pump station
More Products