Prefabricated pump station for emergency drainage of rainwater and flood
Prefabricated pump station for emergency drainage of rainwater and flood

Prefabricated pump station for emergency drainage of rainwater and flood

Category:

Environmental Protection/Sewage treatment equipment/Sewage lift

Model:

JZPPS-4.0-7.5-7.5/2

Brand:

Kanazawa

model:

JZPPS-4.0-7.5-7.5/2

Discharge caliber:

three hundred and fifty

Inhalation caliber:

two hundred

head:

thirty

Maximum particle size allowed:

thirty

Overall dimensions:

400*750

Processing & Customization:

yes

Specifications:

4.0*7.5

Is it a cross-border source of goods:

No

manufacturer:

Yancheng Jinze Water Supply Equipment Co., Ltd

Retail Price

25,000.00USD


重量

kg

  • Product Description
  • model

    JZPPS-4.0-7.5-7.5/2

    Discharge caliber

    three hundred and fifty

    Inhalation caliber

    two hundred

    head

    thirty

    Maximum particle size allowed

    thirty

    Overall dimensions

    400*750

    Processing & Customization

    yes

    Specifications

    4.0*7.5

    Is it a cross-border source of goods

    No

    manufacturer

    Yancheng Jinze Water Supply Equipment Co., Ltd

    Description :

    Prefabricated pump station Advantages of prefabricated pump stations: Prefabricated pump stations are an ideal alternative to traditional sewage pump stations. Usually, traditional pump stations have very strict requirements for planning and construction, requiring every detail to be planned, and the installation of pump stations also requires a lot of manpower, material resources, and time. It is necessary to arrange the construction site and pour concrete, which requires a lot of time to wait for the concrete to harden. Then it is necessary to determine the water inlet point, drill holes, and install the necessary components. It will take at least 2 months to complete these processes. After having a prefabricated pump station, you can complete all the processes including excavation, backfilling, compaction, connection, leak testing, control system installation, trial operation, final debugging, and document recording within one or two weeks. This will save 7 weeks of prefabricated pump station installation time, with a time-saving ratio of 80%. More importantly, it can solve a series of problems such as leakage and corrosion in traditional pump stations, pump failures, sediment deposition, environmental pollution, frequent maintenance, and high costs.

    AfterSalesService :

    Key words:
    • Prefabricated pump station