Pinggu District Asphalt Cold Oil/Cold Supplement Self operated Factory/Same city Delivery
Pinggu District Asphalt Cold Oil/Cold Supplement Self operated Factory/Same city Delivery

Pinggu District Asphalt Cold Oil/Cold Supplement Self operated Factory/Same city Delivery

Category:

fine chemicals /Fine Chemicals for Construction/Other building additives

Model:

MR-100

Brand:

Haiyan Xingye

model:

MR-100

Main ingredients:

asphalt

color:

black

odor:

none

density:

tall

water-soluble:

good

Minimum operating temperature:

-30

Maximum operating temperature:

forty

shelf life:

12 months

Packing Specification:

25kg

manufacturer:

Beijing Shunyi

Retail Price

1,300.00USD


重量

kg

  • Product Description
  • model

    MR-100

    Main ingredients

    asphalt

    color

    black

    odor

    none

    density

    tall

    water-soluble

    good

    Minimum operating temperature

    -30

    Maximum operating temperature

    forty

    shelf life

    12 months

    Packing Specification

    25kg

    manufacturer

    Beijing Shunyi

    Description :

      Beijing Pinggu District Asphalt Cold Oil Self operated Factory/Same city Delivery

      Cold patching asphalt oil/asphalt cold oil/mixed asphalt cold patching material

      10 fine aggregate cold asphalt is used for road repair. Fine aggregate cold asphalt has good compactness and is not easy to loosen when repairing roads

      Factory wholesale and retail, sufficient supply, discounted prices, welcome to order!

      Main business areas: Shunyi, Chaoyang, Tongzhou, Haidian, Daxing, Fangshan, Pinggu, Miyun, Shijingshan, Mentougou, Huairou

      The construction temperature of asphalt cold patching material can be divided into three categories, which can adapt to construction within the range of 50 ℃ to -35 ℃:

      1. Summer: Suitable for temperatures above 20 ℃,

      2. Spring and Autumn: Suitable for temperatures between 0 ℃ and 20 ℃,

      3. Winter: Suitable for temperatures between 0 ℃ and -35 ℃,

      The compaction density of Beijing Haiyan Xingye asphalt cold patching material is 2.3 tons/cubic meter, and 1 ton of cold patching material can repair 16 square meters of 3cm deep pits.

      Cold replenishment construction

      Using cold repair materials, there is no need to stick layer oil during repair, and the materials can be taken as needed without the need for heavy construction machinery. Depending on the different repair conditions of the road surface, impact compaction, manual compaction, etc. can be used.

      Repair quality:

      The cold patching material has anti-aging and bonding functions. The repaired anti cavitation material is not easy to fall off, crack and other undesirable phenomena, and does not need to be repaired again.

      Open to traffic immediately

      The area repaired with cold repair materials does not require traffic closure and can be immediately opened to traffic, greatly alleviating traffic congestion caused by road repair construction.

      

    AfterSalesService :

    Key words:
    • Pinggu Cold Asphalt