Suzhou Jinwei Machinery PE Geomembrane Equipment/Waterproof Roll Production Line
Category:
Rubber and plastic/Plastic machinery/Plastic sheet equipment
Model:
JW150-4000
Brand:
Jinwei Machinery
Retail Price
3,288,888.00USD
重量
kg
- Product Description
-
Description :
PE geomembrane/waterproofing membrane production line
Product application: Roof waterproofing for industrial and civil buildings, including planted roofs, flat roofs, sloping roofs, and underground waterproofing for buildings, including waterproofing for reservoirs, embankments, water pools, and tunnels
Roads, grain depots, civil air defense projects, landfill sites, artificial lake waterproofing, etc.
Product Features
1. Choosing ethylene vinyl acetate copolymer, a thermoplastic with rubber like elasticity, gives the finished product good flexibility. The processing of details such as corners and pipes is quite simple and fast.
2. High tear resistance, good puncture resistance, good waterproof, anti-seepage, and hydrolysis resistance;
3. Adding antibacterial agents to the material to prevent microbial erosion and extend the product's lifespan;
4. Good resistance to root infiltration, especially suitable for planting roofs;
5. The product has a wide adaptability to adhesives and can bond well with various adhesives;
6. There are no special requirements for the moisture content of the grassroots. As long as there is no visible water, normal construction can be carried out without any impact on the construction quality;
7. Good aging resistance;
8. Good flexibility at low temperatures, able to maintain good flexibility even under low temperature conditions;
9. The product is completely free, made of green material;
Scope of Application
Transportation engineering: waterproofing and anti-seepage engineering for tunnels, subways, highways, tunnel bodies, bridges, etc;
Construction project: waterproofing and anti-seepage of roofs, basements, etc.
Water conservancy engineering: waterproofing and anti-seepage works such as reservoir embankments, cofferdams, and water channels.
Engineering: Waterproofing for anti-seepage projects such as garbage disposal sites, sewage treatment plants, metallurgical and chemical plants. Other projects that require waterproof, anti-seepage, and moisture-proof treatment.
construction method
Preparation before laying: Requirements for the base layer: Clean the laying surface, ensure that the base is flat, the soil is solid, without unevenness, sharp objects, etc. Waterproof board welding: Joint treatment is a key construction procedure, generally using thermal welding method. The surface of the EVA waterproof board connected is heated to melt it, and then melted into a body through pressure.
1. For the pre laid waterproof board, it is required that there should be no oil stains, moisture, dust, etc. at the edge joints;
2. Before welding, adjust the two edge films at the joint to overlap, with a fixed width and overlap width of 70mm, which is generally flat and free of wrinkles;
3. Use a specialized welding machine for welding.

AfterSalesService :
Key words:- Jinwei Machinery PE Geomembrane Equipment